GERMANTOWN, NY —
OSHA Inspection: TROY BOILER WORKS, INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of TROY BOILER WORKS, INC. in 600 WOODS ROAD, GERMANTOWN, NY 12526 (NAICS 332313). OSHA activity number 347645517.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TROY BOILER WORKS, INC.
- Site address
- 600 WOODS ROAD
- City
- GERMANTOWN
- State
- NY
- ZIP
- 12526
- Mailing
- 2800 7TH AVE., TROY, NY 12180
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332313
- Employees
- 53
- Ownership type
- A
Citations
12 citations on file for this inspection.
1926.1101 E01
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $7,904 Reduced
General-duty citation text
29 CFR 1926.1101(e)(1): All Class I, II, and III asbestos work was not conducted within regulated areas: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not establish a regulated area.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1926.1101 F02 I
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $7,904 Reduced
General-duty citation text
29 CFR 1926.1101(f)(2)(i): The employer failed to ensure that the exposure assessment was conducted in time to comply with requirements which are triggered by the exposure data or the lack of a negative exposure assessment: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not do an exposure assessment of the work area within the building.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1926.1101 G01 I
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $7,904 Reduced
General-duty citation text
29 CFR 1926.1101(g)(1)(i): The employer did not use engineering controls and work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of vacuum cleaners equipped with high efficiency particulate air (HEPA) filters to collect all debris and dust containing asbestos containing material and presumed asbestos containing material: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not use engineering or work practice controls while the employees were dry sweeping and shoveling ACM.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1926.1101 G01 II
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(1)(ii): The employer did not use engineering controls and work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of wet methods or wetting agents to control employee exposures during asbestos handling, mixing, removal, cutting, application and cleanup: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. Wet methods were not used when employees were dry sweeping and shoveling ACM.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G01 III
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(1)(iii): The employer did not use work practices in all operations covered by 29 CFR 1926.1101, regardless of the levels of exposure, in the form of prompt clean-up and disposal of wastes and debris contaminated with asbestos, in leak-tight containers: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not use leak-tight methods for collection and disposal of debris containing asbestos.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 G03 III
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(3)(iii): The following work practices and engineering controls such as, but not limited to, dry sweeping can not be used for work related to asbestos or for work which disturbs ACM or PACM, regardless of measured levels of asbestos exposure or the results of initial exposure assessments: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employers' lack of engineering and work practice controls disturbed ACM.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 H01 IV
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $7,904 Reduced
General-duty citation text
29 CFR 1926.1101(h)(1)(iv): Respirators were not used during all Class II and III asbestos jobs where the employer had not produced a negative-exposure assessment: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not provide respiratory protection while employees were dry sweeping and shoveling ACM.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1926.1101 I01
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(i)(1): The employer did not provide and require the use of protective clothing, such as coveralls or similar whole-body clothing, head coverings, gloves, and foot coverings for each employee exposed to airborne concentrations of asbestos that exceed the time weighted average and/or excursion limit in 29 CFR 1926.1101(c) or for which a required negative exposure assessment was not produced: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not provide protective clothing for employees dry sweeping and shoveling ACM.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1101 J01 IV
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $7,904 Reduced
General-duty citation text
29 CFR 1926.1101(j)(1)(iv): When food or beverages were consumed at a worksite involving Class I asbestos work, the employer did not provide a lunch area in which airborne concentrations of asbestos were below the permissible exposure limit and excursion limit: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not inform employees conducting dry sweeping and shoveling ACM of the locations and quantities of asbestos.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1926.1101 K03 II B
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $7,904 Reduced
General-duty citation text
29 CFR 1926.1101(k)(3)(ii)(B): The employer did not inform employers of employees who worked and/or were working in adjacent areas of the location and quantity of asbestos containing material and/or presumed asbestos containing material present in the area: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not inform employees conducting dry sweeping and shoveling ACM of the locations and quantities of asbestos.
Recent events (2)
- — I (S) $7904.4
- — Z (S) $11292
1926.1101 K08 III
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1101(k)(8)(iii): The employer did not ensure that labels of bags or containers of protective clothing and equipment, scrap, waste, and debris containing asbestos fibers bear the following information: DANGER CONTAINS ASBESTOS FIBERS MAY CAUSE CANCER CAUSES DAMAGE TO LUNGS DO NOT BREATHE DUST AVOID CREATING DUST a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not label materials that contain ACM and/or PACM.
Recent events (2)
- — I (S) $0
- — Z (S) $11292
1926.1101 K09 I
- Issued
- Dec 2, 2024
- Abate by
- Dec 20, 2024
- Penalty
- Initial $11,292 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1101(k)(9)(i): The employer did not institute, at no cost to employees, a training program for each employee who was likely to be exposed in excess of the permissible exposure limit (PEL) and for each employee who performed Class I through IV asbestos operations: a) On or about 7/3/2024, throughout the boiler room, employees removed boiler, boiler components suspected of being potential asbestos containing materials (ACM), and asbestos debris including thermal system insulation (TSI) was also in the area. The employer did not train employees that were dry sweeping and shoveling materials that contain ACM and/or PACM.
Recent events (2)
- — I (S) $0
- — Z (S) $11292
More inspections at Troy Boiler Works, INC.
View Troy Boiler Works, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332313)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347645517.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.