OSHA Inspection: THE WORTHINGTON STEEL COMPANY, LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of THE WORTHINGTON STEEL COMPANY, LLC in 4310 EAST 49TH STREET, CLEVELAND, OH 44125 (NAICS 331221). OSHA activity number 347677684.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch The Worthington Steel Company, LLC — free Get an email when a new federal OSHA severe-injury report for The Worthington Steel Company, LLC is published. One employer, no account, unsubscribe in one click.
Site address
4310 EAST 49TH STREET
City
CLEVELAND
State
OH
ZIP
44125
Mailing
4310 EAST 49TH STREET, CLEVELAND, OH 44125
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
331221
Employees
159
Ownership type
A

1 citation on file for this inspection.

1910.147 C04 II

Other-than-serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2024
Abate by
Nov 6, 2024
Penalty
Initial $16,131 · Current $16,131
29 CFR  1910.147(c)(4)(ii):The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:  On or about August 1, 2024, the employer did not ensure the developed and documented hazardous energy control procedure for the 60" slitter machine line clearly and specifically outlined the scope, purpose, rules, and techniques to be utilized while employees performed service and maintenance activities, such as but not limited to repairing the hydraulic cylinder of the slitter line peeler table machine.    The energy control procedure did not include a specific statement that the intended use of the procedure was for controlling the hazardous energy sources of the individual machines and equipment in each zone of the 60" slitter line or the hazardous energy sources of the entire 60" slitter line when conducting service and maintenance activities [per 1910.147(c)(4)(ii)(A)].    The energy control procedure did not clearly identify the specific procedural steps for blocking and securing the peeler table's hydraulic cylinders or the peeler table's gravitational energy source or specific procedural steps for shutting down, isolating, blocking, and securing individual machines and equipment in each of the individual zones of the 60" slitter line when performing service and maintenance activities [per 1910.147(c)(4)(ii)(B)].    The energy control procedure did not clearly identify the specific procedural steps for the placement and removal of lockout devices for the hydraulic cylinders of the peeler table or specific procedural steps for the placement, removal, or transfer of lockout devices when performing service and maintenance of the individual machines and equipment in each of the individual zones of the 60" slitter line [per 1910,147(c)(4)(ii)(C)].
Recent events (2)
  • — I (O) $16131
  • — Z (S) $16131

View The Worthington Steel Company, LLC's full OSHA safety record →