On , OSHA opened a planned safety inspection of ROI ROOFING AND SUPPLY in 2978 W. 12TH STREET, ERIE, PA 16505 (NAICS 238160). OSHA activity number 348036690.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ROI Roofing and Supply — free Get an email when a new federal OSHA severe-injury report for ROI Roofing and Supply is published. One employer, no account, unsubscribe in one click.
Site address
2978 W. 12TH STREET
City
ERIE
State
PA
ZIP
16505
Mailing
4916 LEE AVE, ERIE, PA 16511
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
6
Ownership type
A

3 citations on file for this inspection.

1926.502 F02 II

Serious Gravity 5 1 instance 5 exposed
Issued
Mar 10, 2025
Abate by
Apr 3, 2025
Penalty
Initial $3,547 · Current $3,400 Reduced
29 CFR 1926.502(f)(2)(ii): The rope, wire, or chain was not rigged or supported in such a way that its lowest point (including sag) was not less than 34 inches (0.9 m) from the walking/working surface and its highest point no more than 39 inches (1.0 m) from the walking/working surface.   a.)  ROI Roofing and Supply, 2978  W. 12th Street, Erie, PA - On or about 2/11/25, and at times prior thereto, employees were engaged in roofing activities on a flat roof approximately 16 feet high. The warning line was touching the roof on several areas of the building.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $3400
  • — Z (S) $3547

1926.502 F01 III

Serious Gravity 5 1 instance 5 exposed
Issued
Mar 10, 2025
Abate by
Apr 3, 2025
Penalty
Initial $0 · Current $0
29 CFR 1926.502(f)(1)(iii): Points of access, material handling areas, storage areas, and/or hoisting areas were not connected to the work area by an access path formed by two warning lines:  a.)  ROI Roofing and Supply, 2978 W. 12th Street, Erie, PA - On or about 2/11/25, and at times prior thereto, employees were engaged in roofing activities on a flat roof approximately 16 feet high. There was not a  path created by rope or other substantial material from the ladder to access the roof to the warning line.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.20 B02

Other-than-serious Gravity 1 1 instance 5 exposed
Issued
Mar 10, 2025
Abate by
Apr 3, 2025
Penalty
Initial $2,128 · Current $0 Reduced
29 CFR  1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):   a.)  ROI Roofing and Supply, 2978  W. 12th Street, Erie, PA - On or about 2/11/25, and at times prior thereto, employees were engaged in roofing activities without a competent person being designated on the site.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (S) $2128

View ROI Roofing and Supply's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348036690.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.