OSHA Inspection: RYNONE MANUFACTURING CORP.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of RYNONE MANUFACTURING CORP. in 297 DOMINIC PACE INDUSTRIAL PARKWAY, SAYRE, PA 18840 (NAICS 326199). OSHA activity number 348160748.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rynone Manufacturing Corp. — free Get an email when a new federal OSHA severe-injury report for Rynone Manufacturing Corp. is published. One employer, no account, unsubscribe in one click.
Site address
297 DOMINIC PACE INDUSTRIAL PARKWAY
City
SAYRE
State
PA
ZIP
18840
Mailing
PO BOX 128, SAYRE, PA 18840
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
326199
Employees
59
Ownership type
A

7 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 6 instances 59 exposed
Issued
Sep 5, 2025
Abate by
Jan 22, 2026
Penalty
Initial $14,895 · Current $14,895

Hazardous substances E200

OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm, including severe burns, to employees in that employees were exposed to fire, flash fire, deflagration, or explosion hazards from dust collectors located inside a building:  a) Blue Line - Grinding Booth: Two dust collectors (Donaldson ECB), used to capture the combustible dust generated by grinding on cultured marble countertops, were located inside the building and not equipped with explosion protection systems, on or about April 3, 2025.  b) Blue Line - Grinding Booth: Two dust collectors (Donaldson DWS), used to capture the combustible dust generated by grinding on cultured marble countertops, were located inside the building and not equipped with explosion protection systems, on or about April 3, 2025.  c) Yellow Line - Grinding Booth: Two dust collectors (Donaldson ECB), used to capture the combustible dust generated by grinding on cultured marble countertops, were located inside the building and not equipped with explosion protection systems, on or about April 3, 2025.  d) White Line - Grinding Booth: One dust collector (Donaldson ECB), used to capture the combustible dust generated by grinding on cultured marble countertops, was located inside the building and not equipped an explosion protection system, on or about April 3, 2025.  e) White Line - Grinding Booth: Two dust collectors (Donaldson DWS), used to capture the combustible dust generated by grinding on cultured marble countertops, were located inside the building and not equipped with explosion protection systems, on or about April 3, 2025.  f) White Line - Grinding Booth: An enclosureless baghouse dust collector, used to capture the combustible dust generated by grinding on cultured marble countertops, was located inside the building and not equipped with an explosion protection system, on or about April 3, 2025.  ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1910.22 A01

Serious Gravity 10 1 instance 59 exposed
Issued
Sep 5, 2025
Abate by
Oct 8, 2025
Penalty
Initial $14,895 · Current $14,895

Hazardous substances E200M102

29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms, service rooms, and walking-working surfaces are kept in a clean, orderly, and sanitary condition:  a) Production Area: The work area where cultured marble countertops were finished contained hazardous accumulations of combustible dust located on the roof structure of the blue line's grinding booth, on or about May 22, 2025.  ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1910.134 A02

Serious Gravity 10 1 instance 6 exposed
Issued
Sep 5, 2025
Abate by
Oct 8, 2025
Penalty
Initial $14,895 · Current $14,895

Hazardous substances 15939135

29 CFR  1910.134(a)(2): A respirator was not provided by the employer to each employee when such equipment was necessary to protect the health of the employee:  a) Blue Line - Grinding Booth: An employee was overexposed to particulates not otherwise regulated (total dust) while performing grinding on cultured marble surfaces, and the employer did not require this employee to wear a respirator, on or about May 22, 2025.   ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED  ABATEMENT NOTE: The key elements of a required use respiratory protection program include, but are not limited to, the written program (c), medical evaluation (e), fit testing (f), and training (k).
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1910.1000 A02

Serious Gravity 10 1 instance 6 exposed
Issued
Sep 5, 2025
Abate by
Jan 22, 2026
Penalty
Initial $14,895 · Current $14,895

Hazardous substances 15939135

29 CFR 1910.1000(a)(2): Employee(s) were exposed to an airborne concentration of particulates not otherwise regulated listed in Table Z-1 in excess of the 8 hour Time Weighted Average concentration of 15 milligrams per cubic meter:  a) Blue Line - Grinding Booth: An employee was exposed to particulates not otherwise regulated (total dust) at an 8-hour time-weighted average of 31.7 milligrams per cubic meter of air, approximately 2.1 times the Permissible Exposure Limit of 15 milligrams per cubic meter of air. Sampling was performed for 476 minutes on May 22, 2025. Zero exposure was assumed for the 4 minutes not sampled.   ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1910.1000 E

Serious Gravity 10 1 instance 6 exposed
Issued
Sep 5, 2025
Abate by
Jan 22, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 15939135

29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d):  a) Blue Line - Grinding Booth: An employee was exposed to particulates not otherwise regulated (total dust) at an 8-hour time-weighted average of 31.7 milligrams per cubic meter of air, approximately 2.1 times the Permissible Exposure Limit of 15 milligrams per cubic meter of air. Sampling was performed for 476 minutes on May 22, 2025. Zero exposure was assumed for the 4 minutes not sampled. The employer did not implement feasible administrative and/or engineering controls to reduce employee exposure levels to below the calculated Permissible Exposure Limit for total dust.   ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED   GENERAL METHODS OF CONTROL APPLICABLE IN THESE CIRCUMSTANCES INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:  - Use grinders equipped with integral dust collection systems to minimize airborne particulate generation at the source.  - Utilize local exhaust ventilation (LEV) systems to capture dust directly at the point of grinding. The exhaust ducting must be positioned as close as practicable to the dust generation source and configured to effectively prevent migration of dust into the employee's breathing zone.  - Where practicable, employ wet methods (e.g., wet sanding) to suppress dust emissions during grinding operations on cultured marble surfaces.  - Implement job rotation by rotating employees into areas with lower dust levels to reduce their daily exposure.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1910.1053 D03 V

Serious Gravity 5 1 instance 6 exposed
Issued
Sep 5, 2025
Abate by
Dec 8, 2025
Penalty
Initial $9,045 · Current $9,045

Hazardous substances 9000L100

29 CFR  1910.1053(d)(3)(v): Where the most recent (non-initial) exposure monitoring indicates that employee exposures were below the action level, the employer did not repeat such monitoring within six months of the most recent monitoring until two consecutive measurements, taken seven or more days apart, were below the action level:  a) Production Area - Grinding Booths: Employees were exposed to crystalline silica above the action level, and the employer did not repeat a second follow-up monitoring within six months when the most recent non-initial monitoring indicated that employee exposures were below the action level, on or about May 22, 2025.  ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — C (S) $9045
  • — Z (S) $9045

1910.1053 I01 I

Serious Gravity 5 1 instance 6 exposed
Issued
Sep 5, 2025
Abate by
Oct 23, 2025
Penalty
Initial $9,045 · Current $9,045

Hazardous substances 9000L100

29 CFR  1910.1053(i)(1)(i): The employer did not make medical surveillance available at no cost to each employee, and at a reasonable time and place, for each employee who has been occupationally exposed to respirable crystalline silica at or above the action level for 30 or more days per year:  a) Production Area - Grinding Booths: Employees were exposed to crystalline silica above the action level for 30 or more days per year, and the employer did not make medical surveillance available to all affected employees, on or about May 22, 2025.  ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • — C (S) $9045
  • — Z (S) $9045

View Rynone Manufacturing Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348160748.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.