GLOUCESTER, MA —
OSHA Inspection: A R & R CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of A R & R CONSTRUCTION, INC. in 64 WASHINGTON STREET, GLOUCESTER, MA 01930 (NAICS 238160). OSHA activity number 348161209.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- A R & R CONSTRUCTION, INC.
- Site address
- 64 WASHINGTON STREET
- City
- GLOUCESTER
- State
- MA
- ZIP
- 01930
- Mailing
- 5 INGALLS STREET, LYNN, MA 01902
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 5
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.102 A01
- Issued
- Jul 24, 2025
- Penalty
- Initial $4,256 · Current $4,256
General-duty citation text
29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles. Location - Worksite: On or about 4/4/25, eye protection was not worn when an employee was using a pneumatic nail gun to install shingles.
Recent events (3)
- — A (S) $4256
- — I (S) $1000
- — Z (S) $4256
1926.501 B13
- Issued
- Jul 24, 2025
- Penalty
- Initial $4,965 · Current $4,965
General-duty citation text
29 CFR 1926.501(b)(13): Employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net systems or personal fall arrest systems: Location - Worksite: On or about 4/4/25, employees were exposed to 24-foot fall hazards while installing a new roof without fall protection.
Recent events (3)
- — A (S) $4965
- — I (S) $2000
- — Z (S) $4965
1926.502 D17
- Issued
- Jul 24, 2025
- Penalty
- Initial $2,128 · Current $2,128
General-duty citation text
29 CFR 1926.502(d)(17): The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head. Location - Worksite: On or about 4/4/25, an employee was using a personal fall arrest system with connection point to his hip/front positioning ring.
Recent events (3)
- — A (S) $2128
- — I (S) $0
- — Z (S) $2128
More inspections at A R & R Construction, INC.
View A R & R Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348161209.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.