WOODSTOCK, CT —
OSHA Inspection: JEFFCO FIBRES, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JEFFCO FIBRES, INC. in 102 PEAKE BROOK ROAD, WOODSTOCK, CT 06281 (NAICS 337910). OSHA activity number 348203928.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- JEFFCO FIBRES, INC.
- Site address
- 102 PEAKE BROOK ROAD
- City
- WOODSTOCK
- State
- CT
- ZIP
- 06281
- Mailing
- 102 PEAKE BROOK ROAD, WOODSTOCK, CT 06281
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 337910
- Employees
- 115
- Ownership type
- A
Citations
9 citations on file for this inspection.
1910.303 B02
- Issued
- Jul 7, 2025
- Penalty
- Initial $5,125 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: Building 1, C3 Glue Machine: On, or about, April 24, 2025, a relocatable power tap used to energize a cutting blade was energized through an extension cord, which is not an approved use of a relocatable power tap in the UL listing.
Recent events (2)
- — I (S) $3000
- — Z (S) $5125
1910.305 G01 IV A
- Issued
- Jul 7, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: Building 1, C3 Glue Machine: On, or about, April 24, 2025, an extension cord was used to energize a cutting blade used to split foam inserts.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 B07 I
- Issued
- Jul 7, 2025
- Penalty
- Initial $5,125 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.303(b)(7)(i): Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment: Well Pump House: On, or about, April 24, 2025, an opening was left in the 480 volt Square D panelboard at position 14-16-18.
Recent events (2)
- — I (S) $3000
- — Z (S) $5125
1910.334 A02 II
- Issued
- Jul 7, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(a)(2)(ii): There was a defect or evidence of damage that could have exposed an employee to injury and the defective or damaged item was not removed from service: Building 1, Glue Line #1: On, or about, April 24, 2025, the power cord provided on the Countyline floor fan was pulled from both the plug and motor connections, exposing the inner coated conductors.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.335 A01 I
- Issued
- Jul 7, 2025
- Penalty
- Initial $10,050 · Current $6,000 Reduced
General-duty citation text
29 CFR 1910.335(a)(1)(i): Employees working in areas where there were potential electrical hazards were not provided with electrical protective equipment that was appropriate for the specific parts of the body that needed to be protected and for the work being performed: Facility: On, or about, April 24, 2025, personal protective equipment such as, but not limited to, voltage rated gloves, fire resistive clothing, face shields, balaclavas, hard hats and hearing protection were not provided to employees who performed live electrical work, including trouble-shooting, or who verified that electrical equipment was properly de-energized.
Recent events (2)
- — I (S) $6000
- — Z (S) $10050
1910.106 B04 IV G
- Issued
- Jul 7, 2025
- Abate by
- Aug 21, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.106(b)(4)(iv)(g): The inlet of the fill pipe was not located outside of the buildings: Sprinkler Pump Room: On, or about, April 24, 2025, the fill pipe provided on the 250 gallon diesel storage tank was located inside of the building.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.147 C06 I
- Issued
- Jul 7, 2025
- Abate by
- Aug 21, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: Facility: On, or about, May 12, 2025, the Control of Hazardous Energy Lockout/Tagout Program had not been reviewed/updated since January 18, 2023.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.157 G03
- Issued
- Jul 7, 2025
- Abate by
- Aug 21, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.157(g)(3): Employees who have been designated to use fire fighting equipment as part of the emergency action plan were not provided training in the use of the appropriate equipment: Facility: On, or about, May 12, 2025, the employer had not provided hands-on training to employees who would use portable fire extinguishers in the event of an incipient stage fire.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.1200 F06 II
- Issued
- Jul 7, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(f)(6)(ii): Except as provided in 29 CFR 1910.1200(f)(7) and 29 CFR 1910.1200(f)(8), the employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals and which, in conjunction with the other information immediately available to employees under the hazard communication program, would provide employees with the specific information regarding the physical and health hazards of the hazardous chemical: A. Building 1, Glue Line #1: On, or about, April 24, 2025, spray bottles containing Simple Green, an eye irritant, and BioGold cleaner, an eye, skin and respiratory tract irritant, were not labeled with the identity of the contents and the appropriate hazard warnings. B. Sprinkler Pump Room: On, or about, April 24, 2025, a two hundred and fifty gallon tank of diesel fuel was not provided with a label to identify the contents of the tank and an appropriate hazard warning. Diesel fuel is a Category 3 flammable liquid and can depress the Central Nervous System.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Jeffco Fibres, INC.
View Jeffco Fibres, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 337910)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348203928.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.