Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PSL CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PSL CONSTRUCTION LLC in 141-153 PENN STATION LANE PENN STATION TOWNHOMES, MANHEIM, PA 17545 (NAICS 238130). OSHA activity number 348248410.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch PSL Construction LLC — free Get an email when a new federal OSHA severe-injury report for PSL Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
141-153 PENN STATION LANE PENN STATION TOWNHOMES
City
MANHEIM
State
PA
ZIP
17545
Mailing
101 FORREST DRIVE, READING, PA 19608
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
2
Ownership type
A

1 citation on file for this inspection.

1926.602 D

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 17, 2025
Abate by
Jul 15, 2025
Penalty
Initial $2,837 · Current $2,837
29 CFR 1926.602(d): The employer did not ensure that each employee operating a powered industrial vehicle had been trained and evaluated as required by paragraph 29 CFR 1910.178(l): Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178. and as referenced by the note contained in 1926.602(d).  a) 141-153 Penn Station Lane, Manheim, PA - On or about May 15, 2025, an employee operated a rough-terrain Pettibone 8044 Telehandler without having received a combination of formal instruction, practical training, and evaluation of the operator's performance.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2837

View PSL Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348248410.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.