OSHA Inspection: MARLIN J. STOLTZFUS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARLIN J. STOLTZFUS in 214 EAST NORTH STREET, CARLISLE, PA 17013 (NAICS 238160). OSHA activity number 348387754.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Marlin J. Stoltzfus — free Get an email when a new federal OSHA severe-injury report for Marlin J. Stoltzfus is published. One employer, no account, unsubscribe in one click.
Establishment
MARLIN J. STOLTZFUS
Site address
214 EAST NORTH STREET
City
CARLISLE
State
PA
ZIP
17013
Mailing
211 DEVER HOLLOW ROAD, MILLERSTOWN, PA 17062
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238160
Employees
2
Ownership type
A

6 citations on file for this inspection.

1926.20 B02

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 18, 2025
Abate by
Oct 2, 2025
Penalty
Initial $3,547 · Current $2,100 Reduced
29 CFR  1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person (i.e., a person who is capable of identifying existing hazards and the authority to stop work and make the necessary corrections).   a. 214 East North - On or about July 22, 2025, employees were working at the site were not subject to frequent inspections by a competent person with authority and willingness to stop work and require the use of safety equipment or correct hazards present on site before the start of work. Employees were exposed to fall and struck by hazards.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $3547

1926.102 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 18, 2025
Abate by
Oct 2, 2025
Penalty
Initial $2,837 · Current $2,100 Reduced
29 CFR  1926.102(a)(1): The employer did not ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation:  a. The Roof - On or about July 22, 2025, employees were working on the roof installing slats for the metal roofing, the employees were using pneumatic nail guns without eye protection.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2837

1926.451 G01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 18, 2025
Abate by
Oct 2, 2025
Penalty
Initial $4,965 · Current $2,100 Reduced
29 CFR  1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:   a. 214 East North - On or about July 22, 2025, employees were working from a ladder jack scaffold at a height of greater than 15 feet doing roofing fascia and soffit work without fall protection, the employees were exposed to a fall hazard.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $4965

1926.501 B13

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 18, 2025
Abate by
Oct 2, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a. The Roof - On or about July 22, 2025, employees were preparing the recently stripped roof for the installation of new metal roofing of a two story above grade multi-family structure. The employees were not utilizing fall protection and were exposed to a fall hazard of greater than 15 feet.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.452 K05

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 18, 2025
Abate by
Oct 2, 2025
Penalty
Initial $4,965 · Current $2,100 Reduced
29 CFR  1926.452(k)(5): Scaffold platforms were bridged on to another.   a. 214 East North - On or about July 22, 2025, employees were working from a ladder jack scaffold at a height of greater than 15 feet doing roofing fascia and soffit work while bridging two ladder jack scaffold sections together with the support positioned on the middle Werner fiberglass ladder, the employees were exposed to a fall hazard.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $4965

1926.1051 A

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 18, 2025
Abate by
Oct 2, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided:  a. 214 East North - On or about July 22, 2025, employees were working from a ladder jack scaffold at a height of greater than 15 feet doing roofing fascia and soffit work, the employee had to climb over the platform to reach the ladder, the employees were exposed to a fall hazard.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Marlin J. Stoltzfus's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348387754.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.