Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NEAL CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NEAL CONSTRUCTION, LLC in 3 FREEDOM COURT, MECHANICSBURG, PA 17050 (NAICS 238160). OSHA activity number 348651431.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Neal Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Neal Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
3 FREEDOM COURT
City
MECHANICSBURG
State
PA
ZIP
17050
Mailing
1160 JERUSALEM SCHOOL ROAD, MOUNT WOLF, PA 17347
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
7
Ownership type
A

2 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 1 instance 7 exposed
Issued
Mar 2, 2026
Abate by
Mar 20, 2026
Penalty
Initial $4,965 · Current $4,965
29 CFR 1926.501(b)(13):  Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b).  a.) 3 Freedom Court, Mechanicsburg, PA 17050 - On or about August 27, 2025, employees were performing residential roofing work, approximately 18 feet above grade, without utilizing appropriate means or methods of fall protection.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $4965

1926.503 C03

Serious Gravity 1 1 instance 7 exposed
Issued
Mar 2, 2026
Abate by
Apr 6, 2026
Penalty
Initial $0 · Current $0
29 CFR 1926.503(c)(3):  Inadequacies in an affected employee's knowledge or use of fall protection systems or equipment indicate that the employee has not retained the requisite understanding or skill:  a.) 3 Freedom Court, Mechanicsburg, PA 17050 - On or about August 27, 2025, employees were performing residential roofing work, approximately 18 feet above grade, without utilizing appropriate means or methods of fall protection.  Employees were previously trained on fall protection, but failed to utilized the provided fall protection as indicated in prior fall protection training.
Recent events (1)
  • — Z (S) $0

View Neal Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348651431.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.