STATE COLLEGE, PA —
OSHA Inspection: PEACHEY'S ROOFING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PEACHEY'S ROOFING in 350 BRADLEY AVENUE, STATE COLLEGE, PA 16801 (NAICS 238160). OSHA activity number 348759945.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PEACHEY'S ROOFING
- Site address
- 350 BRADLEY AVENUE
- City
- STATE COLLEGE
- State
- PA
- ZIP
- 16801
- Mailing
- 250 SIGLER STREET, MILROY, PA 17063
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 3
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.454 C
- Issued
- Apr 14, 2026
- Abate by
- Jun 15, 2026
- Penalty
- Initial $2,553 · Current $2,000 Reduced
General-duty citation text
1926.454(c) When the employer has reason to believe that an employee lacks the skill or understanding needed for safe work involving the erection, use or dismantling of scaffolds, the employer shall retrain each such employee so that the requisite proficiency is regained. Retraining is required in at least the following situations: Abatement due date for all open items will be extended to June 15, 2026. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $2000
- — Z (S) $2553
1926.503 C03
- Issued
- Apr 14, 2026
- Penalty
- Initial $3,405 · Current $2,000 Reduced
General-duty citation text
1926.503(c)(3) Inadequacies in an affected employee's knowledge or use of fall protection systems or equipment indicate that the employee has not retained the requisite understanding or skill. Note: The following appendices to subpart M of this part serve as non-mandatory guidelines to assist employers in complying with the appropriate requirements of subpart M of this part. [59 FR 40738, Aug. 9, 1994; 60 FR 5131, Jan. 26, 1995]
Recent events (2)
- — I (S) $2000
- — Z (S) $3405
1926.503 A01
- Issued
- Apr 14, 2026
- Abate by
- May 8, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) 350 Bradley Ave, State College - Roof - On or about February 19, 2026, The employer did not ensure that employees exposed to fall hazards were trained to recognize the fall hazard and the procedure to minimize the hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01 I
- Issued
- Apr 14, 2026
- Abate by
- May 4, 2026
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) 350 Bradley Ave, State College - Roof - On or about February 19, 2026, employees preforming shingling work from a ladder jack scaffold at a height greater than 13 feet were not provided personal fall protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Peachey'S Roofing
View Peachey'S Roofing's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348759945.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.