SYRACUSE, NY —
OSHA Inspection: OBERDORFER, L.L.C.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of OBERDORFER, L.L.C. in 6259 THOMPSON RD., SYRACUSE, NY 13206 (NAICS 000000). OSHA activity number 101545077.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- OBERDORFER, L.L.C.
- Site address
- 6259 THOMPSON RD.
- City
- SYRACUSE
- State
- NY
- ZIP
- 13206
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3365
- Employees
- 185
- Ownership type
- A
Citations
33 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $5,000 · Current $1,060 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to THE HAZARD OF BEING STRUCK BY THE LOAD SHOULD THE LOAD SLIP OFF THE HOOK: a)PERMANENT MOLD AREA, ON OR ABOUT 09-25-96: ONE GARDNER DENVER MODEL #75016AA5 AIR CHAIN HOIST 1/2 TON CAPACITY BEING USED TO MOVE CASTING CATCHER FOR THE WEST GOOSE MACHINE. THE HOIST HAD THE HOOK THROAT LATCH MISSING FROM THE LOAD HOOK. b)GREEN SAND LINE, 6A SHAKEOUT, ON OR ABOUT 10-02-96: ONE GARDNER DENVER MODEL #75106AA4 AIR CHAIN HOST 4 TON CAPACITY BEING USED TO SHAKEOUT MOLDS. THE HOIST HAD THE HOOK THROAT LATCH MISSING FROM THE LOAD HOOK. c)CORE ROOM, 3RD DRY SAND LINE ASSEMBLY AREA, ON OR ABOUT 09-12-96: ONE GARDNER DENVER MODEL #85016AA5, SERIAL NO. A639003, AIR CHAIN HOIST 1/2 TON CAPACITY BEING USED TO MOVE CORES AND MOLDS. THE HOOK THROAT LATCH WAS BROKEN. ABATEMENT NOTES: AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THIS HAZARD IS TO: 1.INSTALL AND/OR REPAIR HOOK THROAT LATCHES. 2.FOLLOW THE REQUIREMENTS OF AMERICAN NATIONAL STANDARD FOR AIR CHAIN HOISTS (ANSI/ASME HST-5M-1985). d)FINISHING DEPT, CELL #1 FINISHING LINE, ON OR ABOUT 10-04- 96: BELOW-THE-HOOK LIFTING DEVICES USED FOR SUSPENDING CASTINGS HAD FABRICATED HOOKS THAT WERE DAMAGED AND REPAIRED. THE REPAIRED HOOKS WERE NOT INSPECTED AND TESTED FOR NEW LOAD CAPACITY. ABATEMENT NOTES: AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD CORRECT THIS HAZARD IS TO: 1.PRIOR TO INITIAL USE AFTER EACH HOOK IS REPAIRED THE HOOK SHALL BE TESTED BY OR UNDER THE DIRECTION OF AN APPOINTEDPERSON AND A WRITTEN REPORT FURNISHED BY SUCH PERSON CONFIRMING THE LOAD RATING OF THE DEVICE PER ASME B30.20- 1993. 2.CONDUCT INITIAL, FREQUENT AND PERIOD INSPECTIONS OF THE LIFTING DEVICES BY DESIGNATED PERSONNEL FOR WEAR, DETERIORATION OR MALFUNCTION PER ASME B30.20-1993.
Recent events (2)
- — R (S) $1060.00
- — Z (S) $5000.00
5(a)(1)
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to THE HAZARD OF INRUNNING NIP POINTS/OR BEING CAUGHT BY MOVING BELT: a)GREEN SAND DEPT., CONVEYOR SYSTEM CONSISTING OF SEVEN CONVEYORS, ON OR ABOUT 09-27-97: THERE WERE NO STOP (PULL) CORDS ALONG THE CONVEYOR SYSTEM IN ACCORDANCE WITH ANSI B20.1-1947, SECTION 11-1101b. ABATEMENT NOTES: AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD CORRECT THIS HAZARD IS TO INSTALL STOP CORDS.L
Recent events (2)
- — J (S) $5000.00
- — Z (S) $5000.00
1910.22 A01
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $3,500 · Current $2,975 Reduced
Recent events (2)
- — J (S) $2975.00
- — Z (S) $3500.00
1910.23 C01
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $5,000 · Current $2,125 Reduced
Recent events (2)
- — J (S) $2125.00
- — Z (S) $5000.00
1910.27 B01 II
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $1,500
Recent events (2)
- — J (O)
- — Z (S) $1500.00
1910.27 C01
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $3,500 · Current $2,975 Reduced
Recent events (2)
- — J (S) $2975.00
- — Z (S) $3500.00
1910.36 B04
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500
Recent events (2)
- — J (O)
- — Z (S) $2500.00
1910.37 Q01
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — J (S) $1500.00
- — Z (S) $1500.00
1910.106 E06 II
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- — J (S) $2125.00
- — Z (S) $2500.00
1910.137 B02 XII
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500
Recent events (2)
- — J (O)
- — Z (S) $2500.00
1910.212 A01
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $3,500 · Current $1,700 Reduced
Recent events (2)
- — R (S) $1700.00
- — Z (S) $3500.00
1910.212 A05
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $2,500
Recent events (2)
- — J (O)
- — Z (S) $2500.00
1910.212 B
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500 · Current $700 Reduced
Recent events (2)
- — R (S) $700.00
- — Z (S) $2500.00
1910.213 C01
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,000 · Current $1,700 Reduced
Recent events (2)
- — J (S) $1700.00
- — Z (S) $2000.00
1910.213 C02
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (S)
- — Z (S)
1910.213 C03
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (S)
- — Z (S)
1910.219 C02 I
- Issued
- Mar 7, 1997
- Abate by
- Apr 9, 1997
- Penalty
- Initial $3,500 · Current $250 Reduced
Recent events (2)
- — R (O) $250.00
- — Z (S) $3500.00
1910.219 F03
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $3,500 · Current $3,500
Recent events (2)
- — J (S) $3500.00
- — Z (S) $3500.00
1910.219 I02
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — J (S) $1500.00
- — Z (S) $1500.00
1910.242 A
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2000.00
1910.254 C02 I
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500 · Current $4,250
Recent events (2)
- — J (S) $4250.00
- — Z (S) $2500.00
1910.254 D09 III
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,000 · Current $2,000
Recent events (2)
- — J (S) $2000.00
- — Z (S) $2000.00
1910.303 B01
- Issued
- Mar 7, 1997
- Abate by
- Apr 9, 1997
- Penalty
- Initial $2,500 · Current $2,125 Reduced
Recent events (2)
- — J (S) $2125.00
- — Z (S) $2500.00
1910.303 C
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — R (S) $2500.00
- — Z (S) $2500.00
1910.304 F04
- Issued
- Mar 7, 1997
- Abate by
- Mar 17, 1997
- Penalty
- Initial $5,000 · Current $4,250 Reduced
Recent events (2)
- — J (S) $4250.00
- — Z (S) $5000.00
1910.304 F07 III
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500
Recent events (2)
- — J (O)
- — Z (S) $2500.00
1910.305 A04 V
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,000
Recent events (2)
- — J (O)
- — Z (S) $2000.00
1910.305 J01 I
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
- Penalty
- Initial $2,500 · Current $2,500
Recent events (2)
- — J (S) $2500.00
- — Z (S) $2500.00
1910.305 J01 II
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (O)
- — Z (S)
1910.219 C03
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (O)
- — Z (O)
1910.219 C04 I
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (O)
- — Z (O)
1910.305 G02 II
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (O)
- — Z (O)
1910.305 J05 V
- Issued
- Mar 7, 1997
- Abate by
- Mar 12, 1997
Recent events (2)
- — J (O)
- — Z (O)
More inspections at Oberdorfer, L.L.C.
View Oberdorfer, L.L.C.'s full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 101545077.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.