Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: WHEELING PITTSBURGH STEEL

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of WHEELING PITTSBURGH STEEL in 219 PUBLIC RD., YORKVILLE, OH 43971 (NAICS 000000). OSHA activity number 103345153.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Wheeling Pittsburgh Steel — free Get an email when a new federal OSHA severe-injury report for Wheeling Pittsburgh Steel is published. One employer, no account, unsubscribe in one click.
Site address
219 PUBLIC RD.
City
YORKVILLE
State
OH
ZIP
43971
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3316
Employees
650
Ownership type
A
Industry flags
Manufacturing safety.

1 citation on file for this inspection.

5(a)(1)

Deleted Serious Gravity 10 1 instance 8 exposed
Issued
Nov 4, 1993
Abate by
Nov 9, 1993
Penalty
Initial $4,250 · Current $4,250
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not furnish employment and a place of employment which were
free from recognized hazards that were causing or likely to cause death
or serious physical harm to employees in that employees were exposed to:
(a)  The cover(s) for the hoistway floor opening located north
of the control station on No. (2) Tin Lane, east dragout section at the
Yorkville, Ohio plant were not secured against accidental displacement,
thus exposing employees to the hazard of falls to another level of
approximately 9 1/2 feet.  Among other methods, one feasible and
acceptable
abatement method to correct this hazard is:
1)  Design hoistway floor opening cover(s) with fastening features
that are intended to prevent accidental displacement; and
2)  Provide and use removable standard guardrail system for all
exposed side(s) of hoistway floor opening during uses of the opening(s).
Recent events (2)
  • — F (S) $4250.00
  • — Z (S) $4250.00

View Wheeling Pittsburgh Steel's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 103345153.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.