Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: LIPPMANN-MILWAUKEE, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of LIPPMANN-MILWAUKEE, INC. in 3271 EAST VAN NORMAN AVENUE, CUDAHY, WI 53110 (NAICS 333131). OSHA activity number 122420961.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Lippmann-Milwaukee, INC. — free Get an email when a new federal OSHA severe-injury report for Lippmann-Milwaukee, INC. is published. One employer, no account, unsubscribe in one click.
Site address
3271 EAST VAN NORMAN AVENUE
City
CUDAHY
State
WI
ZIP
53110
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333131
SIC code (legacy)
3532
Employees
75
Ownership type
A

13 citations on file for this inspection.

5(a)(1)

Serious Gravity 02 1 instance 70 exposed
Issued
Nov 12, 2003
Abate by
Nov 18, 2003
Penalty
Initial $900 · Current $450 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The
employer did not furnish
employment and a place of employment which were free from recognized
hazards that were
causing or likely to cause death or serious physical harm to employees in
that:
(a)The water heater in the East men's washroom had a shutoff valve
installed
between the water tank and the temperature and pressure relief valve.  The
water
heater manufacturers' instructions, which requires a temperature and
pressure
relief valve installed with no other valves between it and the water tank,
shall be
followed.  The manufacturers' instructions also requires that the
temperature and
pressure relief valve be installed near the top of the water heater tank
so that its
temperature sensing element is immersed in the water at the top of the
tank.  One
feasible and useful method of correction would be to remove all other
valves that
are now between the temperature and pressure relief valve and install the
temperature and pressure relief valve into the water heater.
Certification, with date and method of abatement required.
Certification of abatement is required by 29 CFR Part 1903 and is to be
submitted within ten (10)
calendar days after the abatement date.ment
Recent events (2)
  • — I (S) $450.00
  • — Z (S) $900.00

1910.106 D06 III

Serious Gravity 01 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Dec 1, 2003
Penalty
Initial $675 · Current $300 Reduced
Recent events (2)
  • — I (S) $300.00
  • — Z (S) $675.00

1910.106 E02 III

Serious Gravity 01 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Dec 1, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.106 E02 IVC

Serious Gravity 01 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Dec 1, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.106 E02 IVD

Serious Gravity 01 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Nov 18, 2003
Penalty
Initial $675 · Current $400 Reduced
Recent events (2)
  • — I (S) $400.00
  • — Z (S) $675.00

1910.106 E06 I

Serious Gravity 01 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Nov 18, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.147 C04 I

Deleted Serious Gravity 05 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Nov 24, 2003
Penalty
Initial $1,575 · Current $1,575
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $1575.00

1910.303 B02

Serious Gravity 01 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Sep 17, 2003
Penalty
Initial $573 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $573.00

1910.304 F04

Serious Gravity 01 1 instance 1 exposed
Issued
Nov 12, 2003
Abate by
Sep 17, 2003
Penalty
Initial $573 · Current $250 Reduced
Recent events (2)
  • — I (S) $250.00
  • — Z (S) $573.00

1910.305 B01

Serious Gravity 02 1 instance 2 exposed
Issued
Nov 12, 2003
Abate by
Nov 18, 2003
Penalty
Initial $900 · Current $450 Reduced
Recent events (2)
  • — I (S) $450.00
  • — Z (S) $900.00

1910.219 E03 I

Other-than-serious Gravity 01 1 instance 10 exposed
Issued
Nov 12, 2003
Abate by
Nov 24, 2003
Recent events (2)
  • — I (O)
  • — Z (O)

1926.1101 F01 I

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Nov 12, 2003
Abate by
Dec 1, 2003
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 G01

Other-than-serious Gravity 01 1 instance 70 exposed
Issued
Nov 12, 2003
Abate by
Nov 17, 2003
Recent events (2)
  • — I (O)
  • — Z (O)

View Lippmann-Milwaukee, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 122420961.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.