DOVER, OH —
OSHA Inspection: ARIZONA CHEMICAL COMPANY
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of ARIZONA CHEMICAL COMPANY in 875 HARGER STREET, DOVER, OH 44622 (NAICS 000000). OSHA activity number 18179895.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ARIZONA CHEMICAL COMPANY
- Site address
- 875 HARGER STREET
- City
- DOVER
- State
- OH
- ZIP
- 44622
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 2869
- Employees
- 229
- Ownership type
- A
Citations
5 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 22, 1999
- Abate by
- Mar 15, 2000
- Penalty
- Initial $7,000 · Current $3,750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a contact hazard as a result of system upset and/or equipment failure due to an uncontrolled over-pressurization of a vessel: a)In the ester reactor room (building 23), reactor operators were exposed to a contact hazard from chemical and/or thermal burns due to failure of equipment and/or associated controls and the release of chemicals from a vessel such as the catalyst charge pot (V-146) and/or reactor vessels (V-103, V-104, V-107, and V- 108). Among other methods, feasible and acceptable abatement methods to correct this hazard include, but are not limited to, the following: *Provide training and refresher training for reactor operators with emphasis on the specific safety and health hazards of the process, emergency operations including shutdown, and safe work practices applicable to the employee's job task such as, but not limited to, the following: **the knowledge, skills, and abilities to safely run ester batches on reactor vessel #8 (V-108); **the knowledge, skills, and abilities to safely charge 35hydrogen peroxide to reactor vessel #8 (V-108); **operating procedures such as emergency operations, emergency shutdown, and peroxide bleaching; **the consequences of charging any chemical or substance other than TPT through the catalyst charge pot (V-146) and that any deviation could potentially result in over-pressurization beyond the capacity of the charge pot; **the reactive properties of TPT and the hazards associated with the mixing of TPT with water/steam and other chemicals such as 35 hydrogen peroxide in the catalyst charge pot (V-146) and TPT charge lines; **the critical limits on each batch and/or reactor vessel (V-103, V- 104, V-107, and V-108), such as maximum temperatures and pressures, and the consequences of deviation; **the limitations and inadequacies of the pressure relief device on the catalyst charge pot (V-146); and **the safety systems and their functions on each of the reactor vessels. *Ascertain and document that the #8 reactor operator involved in the incident in the ester reactor room (building 23) on October 15, 1998, received and understood the training. *Conduct an organized and systematic evaluation (engineering and hazard analysis) of the ester production process at the facility that will effectively identify potential causes and consequences of system upsets or deviations that could cause safety or health hazards to employees, including items such as, but not limited to, the following: **address charging and mixing of a reactive chemical such as 35 hydrogen peroxide with TPT in the catalyst charge pot (V-146) and TPT charge lines; **address addition and mixing of water and/or steam with TPT in the catalyst charge pot (V-146) and TPT charge lines; **address the consequences of engineering control failure such as, but not limited to, the failure of the pressure relief device in the event of an uncontrolled over-pressurization of the catalyst charge pot (V-146) due to a reaction from TPT mixing with another chemical or water/steam; **address facility siting such as, but not limited to, the location of the controls and the location/construction of the break/control room; **address human factors such as, but not limited to, the potential hazards associated with the capability of three ester reactor operators running four reactors in the event of multiple problems and/or alarms on more than one reactor vessel; **evaluate consequences of charging and mixing of a reactive chemical such as 35hydrogen peroxide with TPT in the catalyst charge pot (V-146) and TPT charge lines; **evaluate consequences of addition and mixing of water and/or steam with TPT in the catalyst charge pot (V-146) and TPT charge lines; **evaluate consequences of the relief system's inability to safely handle an event such as an uncontrolled over-pressurization of the catalyst charge pot (V-146); and**identify and evaluate any previous incidents in the ester reactor room (building 23) such as, but not limited to, the following: ***the incident, approximately 17 to 18 years ago, which involved a reaction between residual TPT and hydrogen peroxide resulting in the upper valve of the sample bomb being blown apart on reactor #3; ***the incident, in approximately 1984, which involved an explosion on a reactor, injuring at least 2 employees, due to static electricity; and ***the incident, in approximately 1948-49, which levelled building 23 killing 1 employee. Abatement certification and documentation are required.tion
Recent events (2)
- — F (S) $3750.00
- — Z (S) $7000.00
5(a)(1)
- Issued
- Mar 22, 1999
- Abate by
- Mar 15, 2000
- Penalty
- Initial $7,000
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a fire/explosion hazard as a result of system upset and/or equipment failure due to an uncontrolled over-pressurization of a vessel: a)In the ester reactor room (building 23), reactor operators were exposed to a fire/explosion hazard due to vessel fragmentation from an uncontrolled over- pressurization of a vessel such as the catalyst charge pot (V-146) and/or reactor vessels (V-103, V-104, V-107, and V-108). Among other methods, feasible and acceptable abatement methods to correct this hazard include, but are not limited to, the following: *Provide training and annual refresher training for reactor operators with emphasis on the specific safety and health hazards of the process, emergency operations including shutdown, and safe work practices applicable to the employee's job task such as, but not limited to, the following: **the knowledge, skills, and abilities to safely run ester batches on reactor vessel #8 (V-108); **the knowledge, skills, and abilities to safely charge 35hydrogen peroxide to reactor vessel #8 (V-108); **operating procedures such as emergency operations, emergency shutdown, and peroxide bleaching; **the consequences of charging any chemical or substance other than TPT through the catalyst charge pot (V-146) and that any deviation could potentially result in over-pressurization beyond the capacity of the charge pot; **the reactive properties of TPT and the hazards associated with the mixing of TPT with water/steam and other chemicals such as 35 hydrogen peroxide in the catalyst charge pot (V-146) and TPT charge lines; **the critical limits on each batch and/or reactor vessel (V-103, V- 104, V-107, and V-108), such as maximum temperatures and pressures, and the consequences of deviation; **the limitations and inadequacies of the pressure relief device on the catalyst charge pot (V-146); and **the safety systems and their functions on each of the reactor vessels. *Ascertain and document that the #8 reactor operator involved in the incident in the ester reactor room (building 23) on October 15, 1998, received and understood the training. *Conduct an organized and systematic evaluation (engineering and hazard analysis) of the ester production process at the facility that will effectively identify potential causes and consequences of system upsets or deviations that could cause safety or health hazards to employees, including items such as, but not limited to, the following: **address charging and mixing of a reactive chemical such as 35 hydrogen peroxide with TPT in the catalyst charge pot (V-146) and TPT charge lines; **address addition and mixing of water and/or steam with TPT in the catalyst charge pot (V-146) and TPT charge lines; **address the consequences of engineering control failure such as, but not limited to, the failure of the pressure relief device in the event of an uncontrolled over-pressurization of the catalyst charge pot (V-146) due to a reaction from TPT mixing with another chemical or water/steam; **address facility siting such as, but not limited to, the location of the controls and the location/construction of the break/control room; **address human factors such as, but not limited to, the potential hazards associated with the capability of three ester reactor operators running four reactors in the event of multiple problems and/or alarms on more than one reactor vessel; **evaluate consequences of charging and mixing of a reactive chemical such as 35hydrogen peroxide with TPT in the catalyst charge pot (V-146) and TPT charge lines; **evaluate consequences of addition and mixing of water and/or steam with TPT in the catalyst charge pot (V-146) and TPT charge lines; **evaluate consequences of the relief system's inability to safely handle an event such as an uncontrolled over-pressurization of the catalyst charge pot (V-146); and**identify and evaluate any previous incidents in the ester reactor room (building 23) such as, but not limited to, the following: ***the incident, approximately 17 to 18 years ago, which involved a reaction between residual TPT and hydrogen peroxide resulting in the upper valve of the sample bomb being blown apart on reactor #3; ***the incident, in approximately 1984, which involved an explosion on a reactor, injuring at least 2 employees, due to static electricity; and ***the incident, in approximately 1948-49, which levelled building 23 killing 1 employee. Abatement certification and documentation are required.tion
Recent events (2)
- — F (S)
- — Z (S) $7000.00
5(a)(1)
- Issued
- Mar 22, 1999
- Abate by
- Mar 15, 2000
- Penalty
- Initial $7,000 · Current $3,750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: 29 CFR 1910.106(h)(8)(i): Maintenance and operating practices were not in accordance with established procedures which did not tend to control leakage and prevent the accidental escape of flammable or combustible liquids: a) In the ester reactor room (building 23) where flammable and combustible liquids are used in ester production, the employers written operating and manufacturing procedures for the production of ester batches were not fully implemented, did not provide clear instructions and did not address all of the safety and health considerations for safely manufacturing esters such as, but not limited to the following: *the manufacturing procedure for the Uniflex 186 ester product was not effectively implemented in that operators, prior to adding sebacic acid, heated the reactor 30 to 60 degrees Fahrenheit higher than what was stated in steps C and F for charging the reactor; *the peroxide bleaching procedure was not effectively implemented in that operators were adding the bleaching agent through the reactor manhead rather than through the charge pot on top of the reactor which was stated in the polymeric peroxide bleaching procedure; *the operating and manufacturing procedures did not provide clear instructions on how TPT (flashpoint approximately 140 degrees F) was to be charged to the reactor vessels; *the operating and manufacturing procedures did not indicate which valves to open and close when charging TPT to the reactor vessels via the catalyst charge pot (V-146); *the operating and manufacturing procedures did not specify the importance of TPT being the only chemical that could be charged through the catalyst charge pot (V- 146) and that any deviation could potentially result in over-pressurization beyond the capacity of the charge pot; and *the reactive properties of TPT and hazards associated with the mixing of TPT with water/steam and other chemicals such as 35hydrogen peroxide in the catalyst charge pot (V-146) and TPT charge lines.
Recent events (2)
- — F (S) $3750.00
- — Z (S) $7000.00
1910.145 C02 I
- Issued
- Mar 22, 1999
- Abate by
- Mar 15, 2000
- Penalty
- Initial $3,500
Recent events (2)
- — F (O)
- — Z (S) $3500.00
5(a)(1)
- Issued
- Mar 22, 1999
- Abate by
- Apr 24, 1999
- Penalty
- Initial $70,000 · Current $37,500 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: 29 CFR 1910.106(h)(4)(iv)(a): Equipment was not designed and arranged to prevent the unintentional escape of liquids and vapors and to minimize the quantity escaping in the event of accidental release: a)In the ester reactor room (building 23), the catalyst charge pot (V-146) and associated controls were not sufficient to minimize uncontrolled over-pressurization of the vessel due to reaction from TPT (tetraisopropyl titanate), which is a combustible liquid (flashpoint approximately 140 degrees F), mixing with another chemical or water/steam. The process system design could not safely handle the temperatures and pressures that could potentially occur due to, but not limited to, the following: * no pressure vessel certification nor ASME certification for the catalyst charge pot (V-146) which was fabricated in-house; *no evaluation of the safe upper and lower limits such as, but not limited to, temperatures and pressures; *no relief system design and design basis; *no design codes and standards employed for the construction; and *no documentation that the catalyst charge pot (V-146) complied with recognized and generally accepted engineering practices.g
Recent events (2)
- — F (U) $37500.00
- — Z (W) $70000.00
More inspections at Arizona Chemical Company
View Arizona Chemical Company's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 18179895.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.