METROPOLIS, IL —
OSHA Inspection: HONEYWELL INTERNATIONAL, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of HONEYWELL INTERNATIONAL, INC. in 2768 N US 45 ROAD, METROPOLIS, IL 62960 (NAICS 325998). OSHA activity number 313017774.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HONEYWELL INTERNATIONAL, INC.
- Site address
- 2768 N US 45 ROAD
- City
- METROPOLIS
- State
- IL
- ZIP
- 62960
- Mailing
- 2768 N US 45 ROAD, METROPOLIS, IL 62960
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325998
- SIC code (legacy)
- 2819
- Employees
- 565
- Ownership type
- A
Citations
18 citations on file for this inspection.
1910.101 B
- Issued
- Jun 21, 2011
- Abate by
- Nov 10, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.101(b): The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks were not in accordance with Compressed Gas Association Pamphlet P-1-1965: (a)Storage of 134a refrigerant cylinders were exposed to physical damage from vehicular impact when stored along the roadway. Compressed Gas Association Pamphlet P-1, Paragraph 3.3.8 states: Protect cylinders from any object that will produce a cut or other abrasion in the surface of the metal. Do not store cylinders near elevators or gangways, or in locations where heavy moving objects may strike or fall on them. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 D03 IB
- Issued
- Jun 21, 2011
- Abate by
- Nov 10, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams: The employer did not ensure the Piping and Instrumentation Diagrams (P&ID) were correct and up to date. Field verification of valves identified several inaccuracies in the P&ID. The following valves were not labeled correctly: (a)Valve tags reversed manipulated during unloading: GS GF2 HV203 and GS GF2 HV209. (b)Valve tags reversed manipulated during unloading: GS HFNTR HV202 and GS HFNTR HV208. (c)Dual relief header downstream #1 HF Tank rupture disc tags reversed: RD 604 and RD 605. (d)Dual relief header downstream #1 HF Tank valve tags reversed: HF U256 HV003 and HV U256 HV002. (e)Dual relief header downstream #1 HF Tank common vent line not marked from RV 606 and RV607. (f)Rupture disk RD660 on HF Dump Tank was not labeled. (g)Dump valves HF U256 AV006 & HF U256 HV015 for tank #1 were field verified on Tank #3. (h)Dump valves HF U256 AV004 & HF U256 HV013 for Tank #3 were field verified on Tank #1. (i)Relief valves on HF Dump Tank U-256 were reversed. RV610 & RV653 were reversed. (j)Relief valves on Tank #2 U-404 were reversed. RV412 & RV413 were reversed. (k)Valve between the inlet RD and RV on Tank #1 had a ball valve listed as HF RD605 HV001, field verification determined valve was labeled HF RD605 HV004. (l)Block valve from HF Dump Tank U-256 was listed as HF U827 HV004, field verification determined that it was labeled HF U287 HV004. (m)Block valve from HF Dump Tank U-256 was listed as HF HFSTG HV006, field verification determined it was labeled HF HFSTG HV007. (n)On Ammonia Storage Tank U-466, the relief valves RV423 & RV422 were reversed. (o)Ammonia unloading line had block valve listed as NH3 LIQSTG HV008, field verification determined it was labeled NH3 LIQSTG HV003. (p)Ammonia vent line had block valve listed as NH3 P404 HV005, field verifiaction determined it was labeled NH3 P404 HV003. (q)Three way valve coming off of Ammonia tank U-466 was not identified on PID. (r)Three way valve coming off of Ammonia tank U-467 was not identified on PID. (s)Relief valve on Ammonia tank U-466 was listed as RV668, field verification indicated it was RV666. There were two RV666 in the field. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 D03 IF
- Issued
- Jun 21, 2011
- Abate by
- Nov 10, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(d)(3)(i)(F): Information pertaining to the equipment in the process did not include design codes and standards employed: (a)Minimum required thicknesses were not appropriately established for process piping per API 574, Inspection Practices for Piping System Components, Section 11.1.4. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 D03 II
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(d)(3)(ii): Equipment did not comply with recognized and generally accepted good engineering practices: (a)Manual block valves were located downstream from automated dump valves at hydrofluoric acid storage tanks U-613, U-404, and U-201. The configuration subrogated the automated rapid deinventory capabilities as prescribed in The Hydrogen Fluoride Industry Practices Institute (HFIPI), Guideline for the Bulk Storage of Anhydrous Hydrogen Fluoride, Sections 2.3, 4.2, 5.4. (b)Hydrofluoric acid storage tanks U-613, U-404, and U-201 were not sized to receive delivery quantities at 1.5 times the size of said anticipated deliveries per Hydrogen Fluoride Industry Practices Institute (HFIPI), Guideline for the Bulk Storage of Anhydrous Hydrogen Fluoride, Section 3.1. (c)Hydrofluoric acid dump tank U-256 intended for deinventory purposes did not have the equivalent capacity of the largest hydrofluoric acid storage tanks U-404 and U-201 per Hydrogen Fluoride Industry Practices Institute (HFIPI), Guideline for the Bulk Storage of Anhydrous Hydrogen Fluoride, Section 5.6. (d)Liquid flow velocity for piping exceeded 5.9 feet/second at 1-1/2" unloading line PFF-747 to assure the integrity of iron fluoride scale to protect against corrosion per Hydrogen Fluoride Industry Practices Institute (HFIPI), Guideline for the Bulk Storage of Anhydrous Hydrogen Fluoride, Section 3.7. (e)The eye wash and shower station was not equipped with an alarm device to sound in the control room at the hydrofluoric acid rail car unloading area per Hydrogen Fluoride Industry Practices Institute (HFIPI), Tank Car Unloading Guideline for AHF, Section 4.2.7. (f)There was no valve capping kit provided for hydrofluoric acid rail car unloading per Hydrogen Fluoride Industry Practices Institute (HFIPI), Tank Car Unloading Guideline for AHF, Section 4.2.1. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 E03 VI
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(e)(3)(vi): The process hazard analysis did not address human factors: (a)The employer did not adequately address human factors in relation to operating the block valve downstream of remote operated dump valve on the hydrogen fluoride storage tanks. Abatement documentation required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 E05
- Issued
- Jun 21, 2011
- Abate by
- Nov 10, 2012
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 29 CFR 1910.119(e)(5): The process hazard analysis team's finding was not resolved in a timely manner and the resolution was not documented: (a)The 2009 PHA team's recommendation #23 regarding re-configuration of hydrofluoric acid storage tanks U-613, U-404, and U-201 manual block valves located downstream of automatic dump valves had not been resolved. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 F01 IB
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(f)(1)(i)(B): The employer did not develop and implement written operating procedures that provided clear instructions for conducting activities in each covered process consistent with the process safety information and did not address normal operations: (a)The employer did not implement written normal operating procedures that provided clear instructions for unloading hydrogen fluoride into three different storage tanks and when switching tanks. Abatement documentation required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 F01 IE
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(f)(1)(i)(E): The employer did not develop and implement written operating procedures that provided clear instructions for conducting activities in each covered process consistent with the process safety information and did not address emergency operations: (a)The employer did not implement written emergency operating procedures that provided clear instructions for emptying hydrogen fluoride tanks by opening valves and isolating nitrogen systems. Abatement documentation required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 J02
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment: The employer did not establish and implement written procedures to maintain the on-going integrity of process valves in the Tank Farm: (a)Valves requiring mechanical locking elements (i.e. carseals) were not documented and audited to ensure they were administratively controlled per American Society of Mechanical Engineers, Boiler & Pressure Vessel Code, Section VIII. (b)Valves (i.e. piping components) were not included in the mechanical integrity program. (c)The HF Hose Adapter Unloading Assembly connection comprised of 1" schedule 80 pipe threads, union, and bushing leaked on 3/10/11. Abatement documentation required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 J04 I
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment: (a)The deadleg on line 2"-PFF-413 was identified with a thickness measurement location but was not inspected on piping inspection report MTW-A2350-07, 9/28/09. (b)The deadlegs/inspection ports on line 6"-PFF-401 were identified with thickness measurement locations but were not inspected on piping inspection reports TKF-RPT- PP180-014, 6/4/08 and MTW-A2350-14, 9/28/09. (c)The HF Hose Adapter Unloading Assembly connection comprised of 1" schedule 80 pipe threads, union, and bushing leaked on 3/10/11. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 J04 II
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspection and testing procedures did not follow recognized and generally accepted good engineering practices: (a)Minimum required thicknesses were not appropriately established for process piping per API 574, Inspection Practices for Piping System Components, Section 11.1.4. (b)100% radiography or ultrasonic testing was not conducted on process piping weld repairs per ASME B31.3, Process Piping, Sections 341.4.3 and 345.9.1. (c)There was no Fitness-For-Service assessment for Tank U-613 which underwent repairs resultant to cracking at the effected area of the east head 2" nozzle where said cracks were ground out and repair welded per API 579, Fitness-For-Service, Sections 2.1.3, 9.2.2.1, and 9.4. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 J04 III
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment were not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience: The employer did not conduct inspections and tests consistent with manufacturers' recommendations and good engineering practices for the following process equipment: (a)5 year hydrostatic testing on hydrogen fluoride tanks; U-613, U-404, and U-201. (b)Testing and exercising hydrogen fluoride tank vent valves; XV-652VB, XV-650VB, and XV-651VB. (c)Testing and exercising hydrogen fluoride tank dump valves; XV-652VA, XV-650VA, XV-651VA. Abatement documentation required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 J05
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(j)(5): Deficiencies were not corrected in equipment that were outside acceptable limits before further usage: (a)Throughout the Tank Farm unit, including - but not limited to, 4" dump lines PFF- 421, PFF-422, and PFF-423, the poor condition of external paint/coating was not addressed. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (O)
- — Z (S) $7000.00
1910.119 J06 I
- Issued
- Jun 21, 2011
- Abate by
- Jun 24, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(j)(6)(i): In the construction of new plants and equipment, the employer did not assure that equipment as it was fabricated was suitable for the process application for which it would be used: (a)The employer did not assure that equipment as it was fabricated was suitable for the process application when installing a new control room and control board panel. There is no abatement documentation or certification required for this item.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 J06 II
- Issued
- Jun 21, 2011
- Abate by
- Jun 24, 2011
- Penalty
- Current $7,000
General-duty citation text
29 CFR 1910.119(j)(6)(ii): Appropriate checks and inspections were not performed to assure that equipment was installed properly and consistent with design specifications and the manufacturer's instructions: (a)The employer did not conduct appropriate checks and inspections to assure equipment was installed properly and consistent with design specifications when dump valves are actuated in the event of an emergency or during maintenance activities. There is no abatement documentation or certification required for this item.
Recent events (2)
- — F (S) $7000.00
- — Z (S)
1910.119 L01
- Issued
- Jun 21, 2011
- Abate by
- Aug 5, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish and implement written procedures to manage changes to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process: (a)There was no MOC (management of change) conducted following a 12/22/10 hydrofluoric acid leak incident at the tank U-613 relief header rupture disk, where revised bolt torque procedures were implemented to ensure compatibility with rupture disks, their holders, and gasket materials. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
- — F (S)
- — Z (S) $7000.00
1910.119 M04 IV
- Issued
- Jun 21, 2011
- Abate by
- Jun 24, 2011
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.119(m)(4)(iv): Incident investigation report did not include factors that contributed to an incident: (a)Incident report IR-07-0471 where there was a hydrogen fluoride leak at vessel U-613 relief header rupture disk holder on 2/22/07 did not identify factors that contributed to the incident. There is no abatement documentation or certification required for this item.
Recent events (2)
- — F (S) $7000.00
- — Z (S) $7000.00
1910.119 M04 V
- Issued
- Jun 21, 2011
- Abate by
- Jun 24, 2011
- Penalty
- Initial $7,000
General-duty citation text
29 CFR 1910.119(m)(4)(v): Incident investigation report did not include recommendations resulting from the investigation: (a)Incident report IR-07-0471 where there was a hydrogen fluoride leak at vessel U-613 relief header rupture disk holder on 2/22/07 did not include recommendations resulting from the investigation. There is no abatement documentation or certification required for this item.
Recent events (2)
- — F (S)
- — Z (S) $7000.00
More inspections at Honeywell International, INC.
View Honeywell International, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 325998)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313017774.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.