OSHA Inspection: FLAGLER COOPERATIVE ASSOCIATION/ARRIBA SITE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FLAGLER COOPERATIVE ASSOCIATION/ARRIBA SITE in 5 MAIN, ARRIBA, CO 80804 (NAICS 111140). OSHA activity number 313721359.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Flagler Cooperative Association/Arriba Site — free Get an email when a new federal OSHA severe-injury report for Flagler Cooperative Association/Arriba Site is published. One employer, no account, unsubscribe in one click.
Site address
5 MAIN
City
ARRIBA
State
CO
ZIP
80804
Mailing
P.O. 398, FLAGLER, CO 80815
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
111140
SIC code (legacy)
0119
Employees
3
Ownership type
A

26 citations on file for this inspection.

5(a)(1)

Serious Gravity 01 2 instances 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $525 · Current $263 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which was free from
recognized hazards
which were likely to cause death or serious physical harm, in that
employees were exposed
to struck by hazards from potential wire rope breaking while being used to
move rail cars:
a) On or about September 13, 2010 and at times prior, employees were
exposed to injury
while operating the east and west rail pullers to move rail cars in that,
the wire rope had
several broken wires.
Among other methods, one feasible and acceptable method to correct this
hazard would be to
develop an wire rope inspection program in accordance with the
manufacturer's
recommendations. Ensure all ropes that fail the inspection criteria are
replaced immediately.
Abatement Note:  Abatement certification and documentation is required for
this
item
(see enclosed "Sample Abatement-Certification Letter").
Recent events (2)
  • — I (S) $262.50
  • — Z (S) $525.00

1910.22 A01

Deleted Serious Gravity 03 3 instances 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $875
Recent events (2)
  • — I (S) $875.00
  • — Z (S) $875.00

1910.23 A08 II

Serious Gravity 03 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.23 C01

Serious Gravity 03 4 instances 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.27 D01 II

Serious Gravity 03 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.27 D02

Deleted Serious Gravity 03 2 instances 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $875
Recent events (2)
  • — I (S) $875.00
  • — Z (S) $875.00

1910.27 D03

Serious Gravity 03 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.36 D01

Serious Gravity 03 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.68 C07 IIA

Deleted Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $525 · Current $525
Recent events (2)
  • — I (S) $525.00
  • — Z (S) $525.00

1910.68 E01

Deleted Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.106 B02 VIIC

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $875
Recent events (2)
  • — I (S) $875.00
  • — Z (S) $875.00

1910.146 C02

Serious Gravity 03 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.157 E02

Other-than-serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $525
Recent events (2)
  • — I (O)
  • — Z (S) $525.00

1910.219 E03 I

Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $875 · Current $438 Reduced
Recent events (2)
  • — I (S) $437.50
  • — Z (S) $875.00

1910.219 F03

Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.272 J01

Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $1,750 · Current $1,000 Reduced
Recent events (2)
  • — I (S) $1000.00
  • — Z (S) $1750.00

1910.272 M01 I

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.272 M03

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.303 B01

Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Penalty
Initial $700 · Current $350 Reduced
Recent events (2)
  • — I (S) $350.00
  • — Z (S) $700.00

1910.304 G02 V

Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.305 B01 II

Serious Gravity 05 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.305 B02

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.305 G01 IV

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.305 G02 II

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.305 G02 III

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

1910.334 A02 II

Serious Gravity 01 1 instance 3 exposed
Issued
Dec 27, 2010
Abate by
Jan 5, 2011
Recent events (2)
  • — I (S)
  • — Z (S)

View Flagler Cooperative Association/Arriba Site's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 313721359.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.