HOLDENVILLE, OK —
OSHA Inspection: MILLS WELL SERVICE, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MILLS WELL SERVICE, INC. in HUGHES #1-10 WELL SEC 10-7N-8E, HUGHES CTY, HOLDENVILLE, OK 74848 (NAICS 213112). OSHA activity number 314936006.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MILLS WELL SERVICE, INC.
- Site address
- HUGHES #1-10 WELL SEC 10-7N-8E, HUGHES CTY
- City
- HOLDENVILLE
- State
- OK
- ZIP
- 74848
- Mailing
- 12525 356TH ST, SEMINOLE, OK 74868
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 213112
- SIC code (legacy)
- 1389
- Employees
- 4
- Ownership type
- A
Citations
5 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 15, 2012
- Abate by
- Mar 21, 2012
- Penalty
- Initial $2,975 · Current $2,975
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm: Well site: On or about October 13, 2011, employees operated a service rig during the insertion of a disposal injection well tubing. The rig was not adequately stabilized as the four guylines anchorages were inadequate and the two tubing board guylines were not attached to anchors. This exposed the employees to the hazards of an over turning rig, falling, and/or being struck by rig and well components. The American Petroleum Institute Recommended Practice for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations, RP 54, 6.3.2 requires that the rig be rigged up in a safe manner before starting well operations with the rig, and 9.2.10 requires that the rig guylines be properly tensioned prior to imposing a load on the derrick or mast. Among other methods, one feasible and acceptable abatement method to correct these hazards is to assure that the rig is safely rigged up prior to the imposition of any operational load on the rig mast and that all the guylines are properly tensioned to certified anchors.d
1910.219 D01
- Issued
- Mar 15, 2012
- Abate by
- Apr 10, 2012
- Penalty
- Initial $1,785 · Current $1,785
1910.219 E03 I
- Issued
- Mar 15, 2012
- Abate by
- Apr 10, 2012
1910.23 C01
- Issued
- Mar 15, 2012
- Abate by
- Apr 3, 2012
1910.157 E03
- Issued
- Mar 15, 2012
- Abate by
- Apr 10, 2012
More inspections at Mills Well Service, INC.
View Mills Well Service, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 213112)
More inspections in OK
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 314936006.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.