NORTH BILLERICA, MA —
OSHA Inspection: SPINCRAFT
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of SPINCRAFT in 500 IRON HORSE PARK, NORTH BILLERICA, MA 01862 (NAICS 336413). OSHA activity number 315431494.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SPINCRAFT
- Site address
- 500 IRON HORSE PARK
- City
- NORTH BILLERICA
- State
- MA
- ZIP
- 01862
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336413
- SIC code (legacy)
- 3728
- Employees
- 58
- Ownership type
- A
Citations
43 citations on file for this inspection.
1910.22 A01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $7000.00
5(a)(1)
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire and explosion hazards: (a) Location - Spin Lathe area: On or about 5/26/11, the employer failed to maintain oxygen hoses in an acceptable condition that was free from oil and grease. Among other methods, a feasible means to eliminate or reduce this hazard is to maintain oxygen lines free from any/all visible oil sheens and deposits in accordance with the material safety data sheet maintained at the worksite. Train all workers and management personnel on how to inspect and rectify oil deposits on oxygen hose lines accordingly. Follow up accordingly.
Recent events (3)
- — F (S)
- — I (S)
- — Z (S)
1910.22 C
- Issued
- Sep 9, 2011
- Abate by
- Dec 7, 2011
- Penalty
- Initial $7,000 · Current $4,525 Reduced
Recent events (3)
- — F (S) $4525.00
- — I (S) $4525.00
- — Z (S) $7000.00
1910.23 A02
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,250 Reduced
Recent events (3)
- — F (S) $3250.00
- — I (S) $3250.00
- — Z (S) $5000.00
1910.23 A08
- Issued
- Sep 9, 2011
- Abate by
- Nov 16, 2011
- Penalty
- Initial $6,000 · Current $3,900 Reduced
Recent events (3)
- — F (S) $3900.00
- — I (S) $3900.00
- — Z (S) $6000.00
1910.23 C01
- Issued
- Sep 9, 2011
- Abate by
- Nov 16, 2011
- Penalty
- Initial $5,000 · Current $3,250 Reduced
Recent events (3)
- — F (S) $3250.00
- — I (S) $3250.00
- — Z (S) $5000.00
1910.23 E01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $4,000 · Current $2,800 Reduced
Recent events (3)
- — F (S) $2800.00
- — I (S) $2800.00
- — Z (S) $4000.00
1910.23 E03 VC
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (3)
- — F (S)
- — I (S)
- — Z (S)
1910.24 B
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $4,000 · Current $2,000 Reduced
Recent events (3)
- — F (S) $2000.00
- — I (S) $2000.00
- — Z (S) $4000.00
1910.36 D01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $4,000 · Current $2,800 Reduced
Recent events (3)
- — F (S) $2800.00
- — I (S) $2800.00
- — Z (S) $4000.00
1910.37 A03
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $4,000 · Current $2,800 Reduced
Recent events (3)
- — F (S) $2800.00
- — I (S) $2800.00
- — Z (S) $4000.00
1910.104 B09
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $4,175 Reduced
Recent events (3)
- — F (S) $4175.00
- — I (S) $4175.00
- — Z (S) $7000.00
1910.110 F02 II
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.132 D01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000
Recent events (3)
- — F (S)
- — I (S)
- — Z (S) $5000.00
1910.134 D01 III
- Issued
- Sep 9, 2011
- Abate by
- Dec 28, 2011
- Penalty
- Initial $7,000
Recent events (3)
- — F (O)
- — I (O)
- — Z (S) $7000.00
1910.147 C06 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.179 J02
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $4,550 Reduced
Recent events (3)
- — F (S) $4550.00
- — I (S) $4550.00
- — Z (S) $7000.00
5(a)(1)
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to crushing hazards: (a) Location - Plant: On or about 4/6/11, the employer failed to conduct frequent inspections of under hung cranes, including but not limited to: 10 ton Shaw under hung bridge crane, a 5 ton Shepard Niles under hung bridge crane and a 12 ton Shaw under hung bridge crane. Among other methods, one feasible and acceptable method to correct this hazard is to establish and implement a program of frequent inspections in accordance with the requirements of the most applicable version of ASME B30.11, American Society of Mechanical Engineers Safety Standard, Monorails and Underhung Cranes.
Recent events (3)
- — F (S)
- — I (S)
- — Z (S)
1910.179 M01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.179 N04 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000
Recent events (3)
- — F (S)
- — I (S)
- — Z (S) $5000.00
1910.212 A01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.212 A05
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $4,000
Recent events (3)
- — F (S)
- — I (S)
- — Z (S) $4000.00
1910.242 A
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $4,400 Reduced
Recent events (3)
- — F (S) $4400.00
- — I (S) $4400.00
- — Z (S) $7000.00
1910.243 C01
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $4,400 Reduced
Recent events (3)
- — F (S) $4400.00
- — I (S) $4400.00
- — Z (S) $7000.00
1910.243 C05 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $4,900 Reduced
Recent events (3)
- — F (S) $4900.00
- — I (S) $4900.00
- — Z (S) $7000.00
1910.253 B04 III
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.254 D08
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $4,000 · Current $2,800 Reduced
Recent events (3)
- — F (S) $2800.00
- — I (S) $2800.00
- — Z (S) $4000.00
1910.254 D09 III
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (2)
- — F (S)
- — Z (S)
1910.303 B01 II
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $3,000 · Current $2,100 Reduced
Recent events (3)
- — F (S) $2100.00
- — I (S) $2100.00
- — Z (S) $3000.00
1910.303 F
- Issued
- Sep 9, 2011
- Abate by
- Sep 15, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.303 G02 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.305 A02 IIIG
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
1910.305 A02 X
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (3)
- — F (S)
- — I (S)
- — Z (S)
1910.1200 H02 II
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $7,000 · Current $3,486 Reduced
Recent events (3)
- — F (S) $3486.00
- — I (S) $3486.00
- — Z (S) $7000.00
1910.147 C04 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $1,500 · Current $1,050 Reduced
Recent events (3)
- — F (O) $1050.00
- — I (O) $1050.00
- — Z (O) $1500.00
1910.179 H04
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (3)
- — F (O)
- — I (O)
- — Z (O)
1910.219 F03
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
- Penalty
- Initial $1,000 · Current $700 Reduced
Recent events (3)
- — F (O) $700.00
- — I (O) $700.00
- — Z (O) $1000.00
1910.303 B02
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (3)
- — F (O)
- — I (O)
- — Z (O)
1910.303 B07 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (3)
- — F (O)
- — I (O)
- — Z (O)
1910.1200 F05 I
- Issued
- Sep 9, 2011
- Abate by
- Oct 26, 2011
Recent events (3)
- — F (O)
- — I (O)
- — Z (O)
1910.137 B02 VIII
- Issued
- Aug 16, 2011
- Abate by
- Sep 2, 2011
- Penalty
- Initial $5,000 · Current $2,500 Reduced
Recent events (3)
- — F (S) $2500.00
- — I (S) $2500.00
- — Z (S) $5000.00
1910.332 B01
- Issued
- Aug 16, 2011
- Abate by
- Sep 6, 2011
- Penalty
- Initial $7,000 · Current $4,550 Reduced
Recent events (3)
- — F (S) $4550.00
- — I (S) $4550.00
- — Z (S) $7000.00
1910.333 A01
- Issued
- Aug 16, 2011
- Abate by
- Sep 20, 2011
- Penalty
- Initial $5,000 · Current $3,500 Reduced
Recent events (3)
- — F (S) $3500.00
- — I (S) $3500.00
- — Z (S) $5000.00
More inspections at Spincraft
View Spincraft's full OSHA safety record →
More inspections in this industry (NAICS 336413)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 315431494.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.