NEW CUMBERLAND, PA ·
OSHA Inspection: PENNSYLVANIA AMERICAN WATER
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PENNSYLVANIA AMERICAN WATER in 275 STEIGERWALT HOLLOW RD, NEW CUMBERLAND, PA 17070 (NAICS 221310). OSHA activity number 334223039.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PENNSYLVANIA AMERICAN WATER
- Site address
- 275 STEIGERWALT HOLLOW RD
- City
- NEW CUMBERLAND
- State
- PA
- ZIP
- 17070
- Mailing
- 800 WEST HERSHEY PARK DRIVE, HERSHEY, PA 17033
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 221310
- Employees
- 7
- Ownership type
- Private (A)
Citations
5 citations on file for this inspection.
1910.119 E03 III
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $4,250 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(iii): The process hazard analysis (PHA) did not address engineering and administrative controls applicable to the hazards and their interrelationships with the covered process: a) 275 Steigerwalt Hollow Road facility - The employer did not adequately evaluate and identify the engineering and administrative controls related to temperature hazards in the PHA for the Chlorine Feed System, on or about May 8, 2012. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- · F (O) $4000
- · C (S) $4250
- · Z (S) $4250
1910.119 E04
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(4): The team conducting the process hazard analysis (PHA) did not include at least one member who was knowledgeable in the specific process hazard analysis methodology being used: a) 275 Steigerwalt Hollow Road facility - The employer's team conducting the PHA for the Chlorine Feed System did not include at least one member knowledgeable in process hazard analysis (PHA) methodology, or or about May 8, 2012. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F03
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $4,250 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.119(f)(3): The employer did not annually certify that operating procedures were current and accurate. a) 275 Steigerwalt Hollow Road facility - the employer did not review and certify that the operating procedures for the chlorine feed system were accurate for 2011.
Recent events (3)
- · F (O) $4000
- · C (S) $4250
- · Z (S) $4250
1910.119 H02 I
- Issued
- Oct 25, 2012
- Penalty
- Initial $3,613 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.119(h)(2)(i): The employer, when selecting a contractor, shall obtain and evaluate information regarding the contract employer's safety performance and programs. a) 275 Steigerwalt Hollow Road facility - The employer did not obtain and evaluate contractor safety performance prior to selecting the contractors, on or about May 8, 2012. No abatement certification or documentation required.
Recent events (3)
- · F (O) $3000
- · C (S) $3613
- · Z (S) $3613
1910.119 O05
- Issued
- Oct 25, 2012
- Abate by
- Nov 16, 2012
- Penalty
- Initial $4,250 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(o)(5): The employer did not retain the two (2) most recent compliance audit reports: a) 275 Steigerwalt Hollow Road facility - The employer did not retain the compliance audit report for 2007, on or about May 8, 2012. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- · F (S) $0
- · C (S) $4250
- · Z (S) $4250
More inspections at Pennsylvania American Water
View Pennsylvania American Water's full OSHA safety record →
More inspections in this industry (NAICS 221310)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 334223039.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.