N DARTMOUTH, MA —
OSHA Inspection: HARVEY INDUSTRIES, INCORPORATED
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of HARVEY INDUSTRIES, INCORPORATED in 7 LEDGEWOOD BOULEVARD, N DARTMOUTH, MA 02747 (NAICS 326199). OSHA activity number 334249349.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HARVEY INDUSTRIES, INCORPORATED
- Site address
- 7 LEDGEWOOD BOULEVARD
- City
- N DARTMOUTH
- State
- MA
- ZIP
- 02747
- Mailing
- 7 LEDGEWOOD BOULEVARD, N DARTMOUTH, MA 02747
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 220
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.212 A01
- Issued
- Jul 12, 2012
- Abate by
- Aug 31, 2012
- Penalty
- Initial $15,000 · Current $6,750 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by pinchpoints: Tribute Line - Double Hung: Pinchpoint between the tilt table and the conveyor at the wrapping lines were not guarded. HARVEY INDUSTRIES, INCORPORATED WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD, WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 312103260, CITATION NUMBER 01, ITEM 001, ISSUED ON 02/12/2009 WITH A FINAL ORDER DATE OF 03/11/2009.
Recent events (2)
- — I (R) $6750
- — Z (R) $15000
1910.178 A04
- Issued
- Jul 12, 2012
- Abate by
- Nov 20, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(4): Modifications and additions which affected capacity and safe operation were performed by the customer or user without manufacturers written approval, and the capacity, operation and maintenance instruction plates, tags or decals were not changed accordingly: Facility: A Hercules boom lift set at a length of 8-feet, 2-inches, was used on the forks of a Yale Lift Truck Model GLC080LJNGAE084 to remove sections in the washer line so they can be cleaned. No written approval from the forklift manufacturer was obtained by the employer. The addition of the boom decreases the capacity of the forklift.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.178 A05
- Issued
- Jul 12, 2012
- Abate by
- Nov 20, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(5): When trucks are equipped with front-end attachments other than factory installed attachments, it was not requested that the truck be marked to identify the attachments and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered: The Yale Lift Truck Model GLC080LJNGAE084 was not marked to reflect the use of the Hercules boom lift.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Harvey Industries, Incorporated
View Harvey Industries, Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 334249349.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.