BOISE, ID —
OSHA Inspection: TAHOE HOMES, LLC
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of TAHOE HOMES, LLC in LOT 12, BLOCK 1 5072 MILL STATION DRIVE, BOISE, ID 83716 (NAICS 236115). OSHA activity number 335197133.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TAHOE HOMES, LLC
- Site address
- LOT 12, BLOCK 1 5072 MILL STATION DRIVE
- City
- BOISE
- State
- ID
- ZIP
- 83716
- Mailing
- 1979 N. LOCUS GROVE ROAD, MERIDIAN, ID 83646
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 1
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.20 B01
- Issued
- Aug 6, 2012
- Abate by
- Aug 31, 2012
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part. a) One of four single family residential structures in the Mill District Subdivision, Lot 12, Block 1; On June 7, 2012 and at times prior thereto, the employer had not developed and/or implemented an accident prevention program to address hazards to which their employees and/or the employees of subcontractors are exposed. Hazards include but are not limited to fall protection, working from ladders, scaffolds and use of both stationary/portable power tools. Note: Abatement certification IS required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $1600
1926.20 B02
- Issued
- Aug 6, 2012
- Abate by
- Aug 31, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person: a) One of four single family residential structures in the Mill District Subdivision, Lot 12, Block 1; On June 7, 2012 and at times prior thereto, the employer did not perform frequent and regular inspections of sites that they controlled to identify, correct and/or eliminate hazards to which their employees and/or the employees of subcontractors are exposed. Hazards included but are not limited to fall protection, working from ladders, scaffolds and use of both stationary/portable power tools. Note: Abatement certification IS required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.21 B02
- Issued
- Aug 6, 2012
- Abate by
- Aug 31, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a) One of four single family residential structures in the Mill District Subdivision, Lot 12, Block 1; On June 7, 2012 and at times prior thereto, the employer does not provide applicable training and/or instruction associated with employees visiting/working at residential construction sites. Note: Abatement certification IS required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Aug 6, 2012
- Penalty
- Initial $0 · Current $800
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) South, west and north sides of the 1st and 2nd levels; On or about June 6, 2012 and at times prior thereto, as the controlling employer, the stucco subcontractor's employees installing lathe and prepping for stucco were not prevented from working on 3 foot wide tubular welded frame scaffold that had sections that were not fully planked. Only two planks were used in lieu of the three that were needed. Note: Abatement certification is NOT required for this item.
Recent events (2)
- — I (S) $800
- — Z (S) $0
1926.451 G04
- Issued
- Aug 6, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(4): Guardrail systems installed to meet the requirements of this section did not comply with the provisions listed in subparagraphs (i) through (xv) of this paragraph. a) South, west and north sides of the 2nd level; On or about June 6, 2012 and at times prior thereto, employees installing lathe and prepping for stucco were working on 3 foot wide tubular welded frame scaffold that had sections where the top rail or mid rail were missing. Note: Abatement certification is NOT required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Tahoe Homes, LLC
View Tahoe Homes, LLC's full OSHA safety record →
More inspections in this industry (NAICS 236115)
More inspections in ID
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335197133.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.