OSHA Inspection: RAMIRO PEREZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RAMIRO PEREZ in 907-915 SHERIDAN RD., CHICAGO, IL 60613 (NAICS 238140). OSHA activity number 335630398.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ramiro Perez — free Get an email when a new federal OSHA severe-injury report for Ramiro Perez is published. One employer, no account, unsubscribe in one click.
Establishment
RAMIRO PEREZ
Site address
907-915 SHERIDAN RD.
City
CHICAGO
State
IL
ZIP
60613
Mailing
2224 N. KEDVALE, CHICAGO, IL 60618
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

15 citations on file for this inspection.

1926.451 A06

Serious Gravity 10 2 instances 2 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $3,080 · Current $1,540 Reduced
29 CFR 1926.451(a)(6): Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design:    a)  Two-point suspension scaffolds were not designed and constructed by a qualified person.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1540
  • — Z (S) $3080

1926.451 D02

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $3,080 · Current $1,540 Reduced
29 CFR 1926.451(d)(2): Suspension scaffold outrigger beams were not made of structural metal or equivalent strength material:    a)  An aluminum extension ladder was being used as an outrigger beam.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1540
  • — Z (S) $3080

1926.1053 B04

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4):  Ladder(s) were used for purposes other than the purpose for which they were designed:    a)  An extension ladder was being used as an outrigger for a two-point suspension scaffold.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 D05 I

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $3,080 · Current $1,540 Reduced
29 CFR 1926.451(d)(5)(i):  Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices shall be made of steel, wrought iron, or materials of equivalent strength:    a)  Fiber rope was being used as a suspension scaffold support device.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1540
  • — Z (S) $3080

1926.451 D05 III

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(5)(iii):  Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices shall be secured against movement by tiebacks installed at right angles to the face of the building or structure, or opposing angle tiebacks shall be installed and secured to a structurally sound point of anchorage on the building or structure.  Sound points of anchorage include structural members, but do not include standpipes, vents, other piping systems, or electrical conduit:    a) Ropes being used as support devices were secured to standpipes on the roof.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 D16

Serious Gravity 5 2 instances 2 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $2,200 · Current $1,100 Reduced
29 CFR 1926.451(d)(16): In addition to the normal operating brake, suspension scaffold power-operated hoists and manually operated hoists did not have a braking device or locking pawl which engages automatically when a hoist makes either of the following uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed:    a)  Employees were working from a two-point adjustable suspension scaffold that did not have a braking device or locking pawl.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1100
  • — Z (S) $2200

1926.451 D17

Serious Gravity 5 2 instances 2 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.451(d)(17):  Manually operated hoists did not have a positive crank force to descend:    a)  Employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 2 instances 2 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $2,200 · Current $1,100 Reduced
29 CFR 1926.451(e)(1):  Portable ladder, hook-on ladder, attachable ladder, stair tower, stairway-type ladder, ramp, runway, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used to access scaffold platforms more than 2 feet above or below a point of access:    a)  Employees were exposed to a fall hazard of approximately 3 stories while accessing the roof from a two point suspension scaffold.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1100
  • — Z (S) $2200

1926.451 F07

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $2,200 · Current $1,100 Reduced
29 CFR 1926.451(f)(7):  Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling, or alteration.  Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.    a)  Two-point suspension scaffolds were erected without the direction of a competent person qualified in scaffold erection.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1100
  • — Z (S) $2200

1926.454 A

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 24, 2012
Abate by
Sep 24, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)  Employees were not trained to recognize and eliminate the hazards associated with working from scaffolding.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G03 I

Serious Gravity 10 2 instances 2 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $3,080 · Current $1,540 Reduced
29 CFR 1926.451(g)(3)(i): Vertical lifelines were not fastened to a fixed safe point of anchorage, independent of the scaffold, and protected from sharp edges and abrasion.  Safe points of anchorage unclude structural members of buildings, but do not include standpipes, vents, other piping systems, electrical conduit, outrigger beams, or counterweights:     a)  Vertical lifelines were not connected to a fixed safe point of anchorage; lifelines were connected to standpipes.    b)  Vertical lifelines were not protected from abrasion.     In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1540
  • — Z (S) $3080

1926.451 G03 IV

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(3)(iv):  Vertical lifelines, independent support lines, and suspension ropes shall not be attached to each other, nor shall they be attached to or use the same point of anchorage, nor shall they be attached to the same point on the scaffold or personal fall arrest system:    a)  Vertical lifelines were attached to ropes being used as suspension scaffold tiebacks.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G04 II

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $2,200 · Current $1,100 Reduced
29 CFR 1926.451(g)(4)(ii): The top edge height on all suspended scaffolds where both a guardrail and a personal fall arrest system are required shall be between 36 inches (0.9 m) and 45 inches (1.2 m) above the platform surface:    a)  No toprail was present on the west suspension scaffold.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1100
  • — Z (S) $2200

1926.451 G04 III

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(iii): When midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they shall be installed between the top edge of the guardrail system and the scaffold platform:    a)  No midrail was present on the east suspension scaffold.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B04 I

Serious Gravity 5 1 instance 3 exposed
Issued
Aug 24, 2012
Abate by
Aug 31, 2012
Penalty
Initial $2,200 · Current $1,100 Reduced
29 CFR 1926.501(b)(4)(i):  Each employee on walking/working surfaces was not protected from falling through holes (including skylights), more than six feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes:    a)  Employees were exposed to falls of approximately one story while working around unprotected skylights.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1100
  • — Z (S) $2200

View Ramiro Perez's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 335630398.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.