On , OSHA opened a planned safety inspection of U.S. DEPARTMENT OF JUSTICE, FEDERAL BUREAU OF INVESTIGATION in 3975 POLE LINE RD, POCATELLO, ID 83201 (NAICS 561611). OSHA activity number 336829395.

Watch U.S. Department OF Justice, Federal Bureau OF Investigation — free Get an email when a new federal OSHA severe-injury report for U.S. Department OF Justice, Federal Bureau OF Investigation is published. One employer, no account, unsubscribe in one click.
Site address
3975 POLE LINE RD
City
POCATELLO
State
ID
ZIP
83201
Mailing
3975 POLE LINE RD, POCATELLO, ID 83201
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
561611
Employees
102
Ownership type
D

7 citations on file for this inspection.

1910.242 B

Serious Gravity 5 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.242(b):  Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:      (a) East Mechanical Room, on or about October 11. 2012, and at times prior thereto, air nozzle relief vents were taped over and did not allow for air pressure to be reduced.    Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (S) $0

1910.303 G01

Serious Gravity 1 2 instances 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.303(g)(1):   Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment:      (a)  Maintenance storage room, on or about October 11, 2012, at times prior thereto, MCC E  Electrical panel was blocked with storage of material.      Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (S) $0

1910.305 B01 II

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(b)(1)(ii):   Unused openings in boxes, cabinets, or fittings were not effectively closed:      (a)    Maintenance storage room, on or about October 11, 2012, and at time prior therto, LKE Breaker box had a missing blank cover.      Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (S) $0

1910.305 G01 IV B

Serious Gravity 1 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.305(g)(1)(iv)(B):   Flexible cords and/or cables were run through holes in walls, ceilings, or floors:      (a) East Mechanical room, on or about October 11, 2012, and at times prior thereto, where an extension cord was run through the exterior wall to provide power to a battery charger.      Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (S) $0

1910.132 A

Other-than-serious 2 instances 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.132(a):  Protective equipment was not provided, used, and maintained in a reliable condition  when necessary whenever hazards capable of causing injury and impairment were encountered:    (a)  East Mechanical Room, on or about October 11, 2012, and at times prior thereto, gloves were not available for use with water treatment chemicals.    (b)  Mechanical Room for Data Center, on or about October 11, 2012, and at times prior thereto, gloves were not available for use with water treatment chemicals.         Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (O) $0

1910.157 C01

Other-than-serious 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.157(c)(1):  Portable fire extinguishers were not mounted, located and identified so that they were readily accessible without subjecting the employees to injuries:      (a)  West Mechanical Room, on or about October 11, 2012, and at times prior thereto, the wall mounted fire extinguisher was not readily accessible.  A snow blower was parked in front of it.       Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (O) $0

1910.159 C10

Other-than-serious 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.159(c)(10):  The minimum vertical clearance of 18 inches between automatic sprinkler systems sprinklers and the material below was not maintained:      (a) Maintenance Shop, on or about October 11, 2012, and at time prior thereto, Storage 119b, material was being stored less than 18 inches from the sprinkler head.       Note:  Abatement certification is required for this item.
Recent events (1)
  • — Z (O) $0

View U.S. DEPARTMENT OF JUSTICE, FEDERAL BUREAU OF INVESTIGATION's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336829395.