PANAMA CITY BEACH, FL —
OSHA Inspection: PANAMA CITY FRAMING & SIDING, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PANAMA CITY FRAMING & SIDING, LLC in 12905 PANAMA CITY BEACH PARKWAY, PANAMA CITY BEACH, FL 32413 (NAICS 238160). OSHA activity number 336969985.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PANAMA CITY FRAMING & SIDING, LLC
- Site address
- 12905 PANAMA CITY BEACH PARKWAY
- City
- PANAMA CITY BEACH
- State
- FL
- ZIP
- 32413
- Mailing
- 2911 PATRICIA ANN LANE, PANAMA CITY, FL 32405
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 8
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.501 B04 II
- Issued
- Nov 6, 2012
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.501(b)(4)(ii): Each employee on a walking/working surface was not protected from tripping in or stepping into or through holes by covers. a. On or about October 20, 2012, on the interior 2nd floor of the building, employees were working around un-protected holes in the floor, exposing themselves to a trip hazard.
Recent events (1)
- — Z (S) $1600
1926.501 B11
- Issued
- Nov 6, 2012
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems: a. On or about October 20, 2012, employees performing work on a 6:12 pitch roof were not protected from a 20-foot fall hazard by the use of of a fall protection system. b. On or about October 20, 2012, employees performing work on a 5:12 pitch roof were not protected from a 14-foot fall hazard by the use of a fall protection system.
Recent events (1)
- — Z (S) $2800
1926.20 B01
- Issued
- Nov 6, 2012
- Abate by
- Dec 26, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.20(b)(1): A safety and health program was not initiated and maintained to provide compliance with the general safety and health provisions of the standard: 1. Management Commitment and Leadership A. Policy statement: goals established, issued, and communicated to employees. B. Program Reviewed Annually. C. Participation in safety meetings, inspections; agenda item in meetings. D. Adequate commitment of resources. E. Safety rules and procedures incorporated into site operations. F. Management observations of safety rules. 2. Assignment of Responsibility A. Safety designee on site, knowledgeable, and accountable. B. Supervisors' (including foremen) safety and health responsibilities understood. C. Employees adherence to safety rules. 3. Identification and Control of Hazards A. Periodic site inspection program involving supervisors. B. Preventive controls in place (PPE, Maintenance, Engineering Controls). C. Action taken to address hazards. D. Safety Committee, where appropriate. E. Technical reference materials available. 4. Training and Education A. Supervisors receive basic safety and health training. B. Specialized training taken when needed. C. Existence of an employee training program, which is ongoing and effective. 5. Recordkeeping and Hazard Analysis A. Records maintained of employee illnesses/injuries, and posted. B. Supervisors perform incident investigations, determine causes, propose corrective action. C. Injuries, near misses, and illnesses are evaluated for trends, similar causes; corrective action initiated. 6. First Aid and Medical Assistance A. First aid supplies and medical services available. B. Employees informed of medical results. C. Emergency procedures and training, where necessary. a. On or about October 20, 2012, at the worksite, a safety and health program had not been initiated and maintained which addressed the basic elements.
Recent events (1)
- — Z (O) $0
More inspections at Panama City Framing & Siding, LLC
View Panama City Framing & Siding, LLC's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336969985.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.