OSHA Inspection: J.D. DURAN CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of J.D. DURAN CONSTRUCTION, INC. in 204 LIBERTY STREET, COLUMBUS, OH 43215 (NAICS 238130). OSHA activity number 337497416.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J.D. Duran Construction, INC. — free Get an email when a new federal OSHA severe-injury report for J.D. Duran Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
204 LIBERTY STREET
City
COLUMBUS
State
OH
ZIP
43215
Mailing
5769 PICKERINGTON-BALTIMORE ROAD, PICKERINGTON, OH 43147
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
10
Ownership type
A

3 citations on file for this inspection.

1926.404 B01 III C

Serious Gravity 5 4 instances 10 exposed
Issued
Dec 21, 2012
Abate by
Jan 11, 2013
Penalty
Initial $2,640 · Current $1,320 Reduced
29 CFR 1926.404(b)(1)(iii)(C):     Each cord set, attachment cap, plug and receptacle of cord sets, and any equipment connected by cord and plug, except cord sets and receptacles which are fixed and not exposed to damage, shall be visually inspected before each day's use for external defects, such as deformed or missing pins or insulation damage, and for indications of possible internal damage. Equipment found damaged or defective shall not be used until repaired.    a. On the 4th floor of the jobsite, a blue extension cord with a hole in the insulation had visible arcing through the hole and was not inspected prior to each days use, thereby exposing employees to a contact hazard.     b. On the 4th floor of the jobsite, there were cracks to the female end of a blue extension cord with visible copper conductor through the cracks and it was not inspected prior to each days use, thereby exposing employees to a contact hazard.     c. On the 4th floor of the jobsite, a blue extension cord was cut or abraded through the outer insulation and it was not inspected prior to each days use, thereby exposing employees to a contact hazard.     d. On the 4th floor of the jobsite, a Makita circular saw had a plug with the strain relief clamp pulled away from the cord and was not inspected prior to each days use, thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (S) $1320
  • — Z (S) $2640

1926.405 A02 II I

Serious Gravity 5 3 instances 10 exposed
Issued
Dec 21, 2012
Abate by
Jan 11, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.405(a)(2)(ii)(I):     Flexible cords and cables shall be protected from damage. Sharp corners and projections shall be avoided. Flexible cords and cables may pass through doorways or other pinch points, if protection is provided to avoid damage.    a. On the 4th floor of the jobsite, a blue extension cord had a hole in the insulation that was visibly arcing through the hole, thereby exposing employees to a contact hazard.     b. On the 4th floor of the jobsite, the female end of a blue extension cord was cracked with visible copper conductor through the cracks, thereby exposing employees to a contact hazard.     c. On the 4th floor of the jobsite, a blue extension cord was cut or abraded through the outer insulation, thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 G02 IV

Serious Gravity 5 1 instance 10 exposed
Issued
Dec 21, 2012
Abate by
Jan 11, 2013
Penalty
Initial $1,760 · Current $880 Reduced
29 CFR 1926.405(g)(2)(iv):     Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.    a. On the 4th floor of the jobsite, the strain relief clamp on a Makita circular saw was pulled away from the cord and exposed the interior conductor insulation, thereby exposing employees to a contact hazard.
Recent events (2)
  • — I (S) $880
  • — Z (S) $1760

View J.D. Duran Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337497416.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.