On , OSHA opened a complaint safety inspection of FELCHAR MANUFACTURING CORP. in 4751 PINE CAMP DRIVE, BINGHAMTON, NY 13904 (NAICS 335210). OSHA activity number 337558613.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FELCHAR MANUFACTURING CORP.
- Site address
- 4751 PINE CAMP DRIVE
- City
- BINGHAMTON
- State
- NY
- ZIP
- 13904
- Mailing
- 196 CORPORATE DRIVE, BINGHAMTON, NY 13904
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 335210
- Employees
- 350
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.147 C01
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative: a) On or about 11/20/2012, Plant #3, Near Machine K27: No lock out procedures were in use while replacing a Sprue Heater. b) On or about 11/21/2012, Plant #3, Niagara B4-4 Mechanical Power Press: No lock out and blocking was in use while hands were in the die making adjustments. Abatement certification is required for these items.
Recent events (2)
- — I (S) $3500
- — Z (S) $5000
1910.147 F03 I
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(f)(3)(i): A procedure was not utilized to afford the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device when servicing and/or maintenance was performed by a crew, craft: a) On or about 11/20/2012, Plant #3: Group lock out was not being utilized on group projects. Abatement certification is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.217 C01 I
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $5,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): a) On or about 11/21/2012, Plant #3, Power Press Area: A Niagara Full Revolution mechanical Power Press (B4-4) had inadequate point of operation guarding. b) On or about 11/21/2012, Plant #3, Power Press Area: A Minster Part Revolution mechanical power press (B1-32) had inadequate point of operation guarding. c) On or about 11/21/2012, Plant #3, Power Press Area: A Niagara Part Revolution mechanical power press (M22) had inadequate point of operation guarding. d) On or about 11/21/2012, Plant #3, Power Press Area: An Aida Part Revolution power press had inadequate point of operation guarding. Abatement certification is required for these items.
Recent events (2)
- — I (S) $3500
- — Z (S) $5000
1910.303 B01
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $7,000 · Current $4,900 Reduced
General-duty citation text
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) On or about 11/20/2012, Plant #3, Near Machine K09: A water heater had a damaged cover, exposing energized parts. b) On or about 11/20/2012, Plant #3, Near Machine K23: An Advantage water cooler was damaged in that the cover was gone, exposing energized parts. c) On or about 11/20/2012, Plant #3, Near Machine K6: An Athena water cooler was damaged in that the cover would not close, exposing energized parts. Abatement documentation is required for these items.
Recent events (2)
- — I (S) $4900
- — Z (S) $7000
1910.303 G02 I
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): a) On or about 9/7/2012, Plant #3, Near Machine K30: Heater bands had exposed energized parts. b) On or about 11/20/2012, Plant #3, Injection Press's: Heater bands on various injection presses had exposed energized parts. c) On or about 11/20/2012, Plant #3, Near Machine K09: A timer had exposed energized parts. d) On or about 11/20/2012, Plant #3, Near Machine K30: A door was left open, exposing energized parts. Abatement documentation is required for these items.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.332 B01
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $7,000 · Current $4,900 Reduced
General-duty citation text
29 CFR 1910.332(b)(1): Employees were not trained in and familiar with the safety-related work practices required by 1910.331 through 1910.335 that pertained to their respective job assignments: a) On or about 9/7/2012 through 11/21/2012, Plant #3: Employees required to test energized live parts were not provided with adequate training regarding safety related work practices. Abatement documentation is required for this item.
Recent events (2)
- — I (S) $4900
- — Z (S) $7000
1910.334 C03
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(c)(3): Rating of equipment. Test instruments and equipment and their accessories shall be rated for the circuits and equipment to which they will be connected and shall be designed for the environment in which they will be used: a) On or about 11/20/2012, Plant #3: Test equipment was in use on energized parts that was not provided with a Cat listing. Abatement documentation is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.335 A01 I
- Issued
- Jan 28, 2013
- Abate by
- Feb 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.335(a)(1)(i): Employees working in areas where there were potential electrical hazards were not using electrical protective equipment that was appropriate for the specific parts of the body to be protected and for the work to be performed a) On or about 9/7/2012 through 11/21/2012, Plant #3: Employees required to test energized live parts were not provided with appropriate PPE including, but not limited to face shields, voltage rated gloves, along with fire resistant shirts and pants. Abatement documentation is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Felchar Manufacturing Corp.
View Felchar Manufacturing Corp.'s full OSHA safety record →
More inspections in this industry (NAICS 335210)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337558613.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.