SHIPPENSBURG, PA —
OSHA Inspection: DOMESTIC CASTING COMPANY, LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of DOMESTIC CASTING COMPANY, LLC in 275 NORTH QUEEN STREET, SHIPPENSBURG, PA 17257 (NAICS 331511). OSHA activity number 338181415.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DOMESTIC CASTING COMPANY, LLC
- Site address
- 275 NORTH QUEEN STREET
- City
- SHIPPENSBURG
- State
- PA
- ZIP
- 17257
- Mailing
- P.O. BOX 220, SHIPPENSBURG, PA 17257
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 331511
- Employees
- 86
- Ownership type
- A
Citations
15 citations on file for this inspection.
1910.23 E01
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $3,080 · Current $2,310 Reduced
General-duty citation text
29 CFR 1910.23(e)(1): Standard railings did not consist of top rail, intermediate rail and/or posts: (a) Scrap Drying Pit - Employees walked in the aisle way next to the scrap drying pit. The railing across the open-sided floor at the scrap drying pit did not meet the requirements of a standard railing in two section, as follows: the mid-rail had gotten broken off of the section of railing extending from the ladder used to access the pit to the area where the charge bucket went into the pit, and the section across where the charge bucket entered the pit had only a chain top rail and no mid-rail, of 5 feet to the bottom of the scrap drying pit, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement. (b) System II Shakeout Area - The shakeout employee was exposed to an inadequately guarded open sided floor in that there was an incomplete guardrail filling the space under the sand hopper, on or about January 18, 2013. No abatement certification or documentation required.
Recent events (2)
- — I (S) $2310
- — Z (S) $3080
1910.94 A03 I E 1
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $2,310 · Current $1,733 Reduced
General-duty citation text
29 CFR 1910.94(a)(3)(i)(e)(1): Doors shall be flanged and tight when closed: (a) Shot Blast - The rubber belting at the bottom of the door of the Wheelabrator had become worn, and the machine expelled abrasive steel shot continuously exposing employees to a struck-by hazard, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1733
- — Z (S) $2310
1910.146 C01
- Issued
- Jul 9, 2013
- Abate by
- Aug 26, 2013
- Penalty
- Initial $3,850 · Current $2,888 Reduced
General-duty citation text
29 CFR 1910.146(c)(1): The employer did not evaluate the workplace to determine if any spaces were permit-required confined spaces: (a) Scrap Drying Pit - The employer did not identify the scrap drying pit as a permit-required confined space, and required employees to enter the space to clean, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2888
- — Z (S) $3850
1910.146 C02
- Issued
- Jul 9, 2013
- Abate by
- Aug 26, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.146(c)(2): The employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces: (a) Scrap Drying Pit - The employer did not post signs identifying the scrap drying pit as a permit-required confined space, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.146 C04
- Issued
- Jul 9, 2013
- Abate by
- Aug 26, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.146(c)(4): When the employer decided that its employees would enter permit spaces, the employer did not develop and implement a written permit space entry program that complied with 29 CFR 1910.146: (a) Scrap Drying Pit - The employer did not develop and implement a written confined space entry program, and required employees to enter the scrap drying pit, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 II
- Issued
- Jul 9, 2013
- Abate by
- Aug 26, 2013
- Penalty
- Initial $3,850 · Current $2,888 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to items (a) through (d) of this section: (a) Core Room - The machine specific lockout/tagout procedures for the core making machines that used sulfur dioxide did not identify the sulfur dioxide as a hazardous energy source and so the procedures did not specifically outline the techniques to use for controlling this hazardous energy source during servicing and maintenance activities, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2888
- — Z (S) $3850
1910.147 C07 I
- Issued
- Jul 9, 2013
- Abate by
- Aug 26, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: (a) Core Room - The employer did not provide adequate training in lockout/tagout in that the employer did not require employees to use and employees did not use lockout/tagout when changing core boxes (a set-up activity), on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 D
- Issued
- Jul 9, 2013
- Abate by
- Aug 26, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): (a) Core Room - An employee changed a core box on the CB22-SO2 core making machine. The employee only activated the emergency stop and did not de-energize the air and sulfur dioxide and did not apply lockout/tagout any of the three energy sources because the employer did not require employees to use lockout/tagout during this set-up activity, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $3,080 · Current $2,310 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operators and other employees from hazards created by rotating parts: (a) Shot Blast - An auger, located at floor level, carried abrasive steel shot to the bucket elevator of the Wheelabrator tumble shot blasting machine. The cover of this auger had an opening in it to allow employees to shovel steel shot from off the floor back into the auger, which exposed employees to the in-running nip points of the auger, on or about January 11, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $2310
- — Z (S) $3080
1910.305 B02
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $2,310 · Current $1,733 Reduced
General-duty citation text
29 CFR 1910.305(b)(2): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: (a) System 2, on the Wall beside the Mixer - A junction box, with wiring for lighting, had no cover and the wiring hung out of the box, exposing employees who worked in the area to contact with electrical current, on or about January 11, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1733
- — Z (S) $2310
1910.23 C01
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $7,700 · Current $5,775 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards: (a) Shot Blast - Employees stood on the platform, 14 feet 10 inches above the floor, at the Wheelabrator tumble shot blasting machine, to clean the rotary screen of this machine. The platform did not have a standard railing, exposing employees to a fall to the floor below, on or about January 10, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records. (b) System II Shakeout Area - The shakeout employee was exposed to an inadequately guarded open sided floor in that there was an unguarded opening between the sand hopper and the impurity waste bin across the aisle from the System II shakeout, on or about January 18, 2013. No abatement certification or documentation required. DOMESTIC CASTING, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARD OR ITS EQUIVALENT STANDARD 1910.23(c)(1), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 116215120, CITATION NUMBER 2, ITEM NUMBER 1, AND WAS AFFIRMED AS A FINAL ORDER ON JUNE 1, 2011, WITH RESPECT TO A WORKPLACE LOCATED AT 275 NORTH QUEEN STREET, SHIPPENSBURG, PENNSYLVANIA.
Recent events (2)
- — I (R) $5775
- — Z (R) $7700
1910.219 D01
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $6,160 · Current $4,620 Reduced
General-duty citation text
29 CFR 1910.219(d)(1): Pulleys with parts seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): (a) Shot Blast - The pulley on the motor, 54 inches above the floor, and the pulley to the gear, 74 inches above the floor, on the side of the Wheelabrator tumble shot blasting machine did not have adequate guarding as follows: the existing guard did not cover the pulleys at all on the side facing the motor and the expanded metal had gotten removed around the face of each of the two pulleys on the side facing away from the motor, exposing the spokes of the pulleys and exposing employees to in-going nip points and a caught-in hazard, on or about January 11, 2013. DOMESTIC CASTING, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARD OR ITS EQUIVALENT STANDARD 1910.219(d)(1), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 116215120, CITATION NUMBER 2, ITEM NUMBER 4, GROUP A AND WAS AFFIRMED AS A FINAL ORDER ON JUNE 1, 2011, WITH RESPECT TO A WORKPLACE LOCATED AT 275 NORTH QUEEN STREET, SHIPPENSBURG, PENNSYLVANIA. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (R) $4620
- — Z (R) $6160
1910.219 E03 I
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.219(e)(3)(i): Vertical or inclined belts were not enclosed by guards conforming to the requirements specified at 29 CFR 1910.219(m) and (o): (a) Shot Blast - The two belts on the motor and gear pulleys, running from 54 inches to 74 inches above the floor, on the side of the Wheelabrator tumble shot blasting machine did not have adequate guarding as follows: the existing guard did not cover the belts at all on the side facing the motor, exposing employees to in-going nip points hazard, on or about January 11, 2013. DOMESTIC CASTING, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARD OR ITS EQUIVALENT STANDARD 1910.219(e)(3)(i), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 116215120, CITATION NUMBER 2, ITEM NUMBER 4, GROUP C AND WAS AFFIRMED AS A FINAL ORDER ON JUNE 1, 2011, WITH RESPECT TO A WORKPLACE LOCATED AT 275 NORTH QUEEN STREET, SHIPPENSBURG, PENNSYLVANIA. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (R) $0
- — Z (R) $0
1910.219 F03
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $6,160 · Current $0 Reduced
General-duty citation text
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were 7 feet or less above floors or platforms were not enclosed: (a) Shot Blast - The chain and sprocket that drove the tumbler on the Wheelabrator tumble shot blasting machine, and which had a bottom height of 72 inches above the floor, did not have adequate guarding in that the existing guard did not cover the chain and sprocket at all on the side facing the machine, exposing employees to an in-going nip point, on or about January 11, 2013. (b) Shot Blast - The chains and sprockets for raising and lowering the loader and for opening and closing the door on the Wheelabrator tumble shot blasting machine had no guarding, exposing employees working on the platform at the rotary screen to in-going nip points, on or about January 11, 2013. DOMESTIC CASTING, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARD OR ITS EQUIVALENT STANDARD 1910.219(f)(3), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 116215120, CITATION NUMBER 1, ITEM NUMBER 7, AND WAS AFFIRMED AS A FINAL ORDER ON JUNE 1, 2011, WITH RESPECT TO A WORKPLACE LOCATED AT 275 NORTH QUEEN STREET, SHIPPENSBURG, PENNSYLVANIA. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (R) $0
- — Z (R) $6160
1910.303 G02 I
- Issued
- Jul 9, 2013
- Abate by
- Aug 8, 2013
- Penalty
- Initial $6,160 · Current $6,160
General-duty citation text
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): (a) Shot Blast - Wires spliced with wire nuts, which supplied power for lighting, hung out between the bottom of the transformer and the switches mounted on the side wall behind the Wheelabrator tumble shot blasting machine, exposing employees to injurious contact with electric current, on or about January 11, 2013. DOMESTIC CASTING, LLC WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION STANDARD OR ITS EQUIVALENT STANDARD 1910.303(g)(2)(i), WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 116215120, CITATION NUMBER 1, ITEM NUMBER 8b, AND WAS AFFIRMED AS A FINAL ORDER ON JUNE 1, 2011, WITH RESPECT TO A WORKPLACE LOCATED AT 275 NORTH QUEEN STREET, SHIPPENSBURG, PENNSYLVANIA. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $6160
- — Z (R) $6160
More inspections at Domestic Casting Company, LLC
View Domestic Casting Company, LLC's full OSHA safety record →
More inspections in this industry (NAICS 331511)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338181415.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.