TROY, OH —
OSHA Inspection: TROY LAMINATING AND COATING, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TROY LAMINATING AND COATING, INC. in 421 S. UNION STREET, TROY, OH 45373 (NAICS 322121). OSHA activity number 338927346.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TROY LAMINATING AND COATING, INC.
- Site address
- 421 S. UNION STREET
- City
- TROY
- State
- OH
- ZIP
- 45373
- Mailing
- 421 S. UNION STREET, TROY, OH 45373
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 322121
- Employees
- 44
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 D03
- Issued
- Jul 31, 2013
- Abate by
- Nov 29, 2013
- Penalty
- Initial $3,500 · Current $3,500
General-duty citation text
29 CFR 1910.147(d)(3): Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): (a) Employees changed the blade on the DoAll Vertical Band Saw without first isolating the energy source. (b) Employees cleaned and replaced the rollers and knives on the #11, #16 and #18 coaters, without first isolating the energy sources. (c) Employees cleaned and replaced the rollers and knives on the #475 Coater, without first isolating the energy sources. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
- — I (S) $3500
- — Z (S) $3500
1910.147 D04 I
- Issued
- Jul 31, 2013
- Abate by
- Nov 29, 2013
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees: (a) Employees changed the blade on the DoAll Vertical Band Saw without first affixing a lock to each energy isolating device. (b) Employees cleaned and replaced the rollers and knives on the #11, #16 and #18 coaters, without first affixing a lock to each energy isolating device. (c) Employees cleaned and replaced the rollers and knives on the #475 Coater, without first affixing a lock to each energy isolating device. Troy Laminating and Coating, Inc. was previously cited for a violation of this occupational safety and health standard, or its equivalent standard, which was contained in OSHA inspection number 314343096, Citation Number 1, Item Number 4 and was affirmed as a final order on August 11, 2010, with respect to a workplace located at 421 S. Union Street, Troy, OH 45373. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
- — I (S) $0
- — Z (R) $7000
1910.147 C06 I C
- Issued
- Jul 31, 2013
- Abate by
- Nov 29, 2013
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i)(C): Where LOTO was used for energy control, the periodic inspection did not include a review between the inspector and each authorized employee, of that employees responsibilities under the energy control procedures being inspected: (a) There were no periodic reviews between an inspector and the authorized employees, to include a demonstration by the authorized employees of specific energy isolation procedures. Troy Laminating and Coating, Inc. was previously cited for a violation of this occupational safety and health standard, or its equivalent standard, which was contained in OSHA inspection number 314343096, Citation Number 1, Item Number 2 and was affirmed as a final order on August 11, 2010, with respect to a workplace located at 421 S. Union Street, Troy, OH 45373. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
- — I (R) $3500
- — Z (R) $7000
1910.147 C07 I
- Issued
- Jul 31, 2013
- Abate by
- Nov 29, 2013
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees: (a) Not all employees working in the maintenance shop were provided with training on the energy control program, such as when and how to attach a lock to the energy isolating device, prior to changing the blade on the DoAll Vertical Band. (b) Employees operating, or performing maintenance on, the #11, #16 and #18 coaters, were not adequately trained on the energy control program, such as when and how to attach locks to the energy isolating devices, prior to cleaning and replacing rollers and knives. (c) Employees operating, or performing maintenance on, the #475 Coater, were not adequately trained on the energy control program, such as when and how to attach locks to the energy isolating devices, prior to cleaning and replacing rollers and knives. Troy Laminating and Coating, Inc. was previously cited for a violation of this occupational safety and health standard, or its equivalent standard, which was contained in OSHA inspection number 314343096, Citation Number 1, Item Number 3 and was affirmed as a final order on August 11, 2010, with respect to a workplace located at 421 S. Union Street, Troy, OH 45373. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.
Recent events (2)
- — I (R) $3500
- — Z (R) $7000
More inspections at Troy Laminating and Coating, INC.
View Troy Laminating and Coating, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 322121)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338927346.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.