OSHA Inspection: JOSE MARES

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JOSE MARES in 2615 ALLAN LAKE LN, SPRING, TX 77388 (NAICS 238140). OSHA activity number 338958010.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Jose Mares — free Get an email when a new federal OSHA severe-injury report for Jose Mares is published. One employer, no account, unsubscribe in one click.
Establishment
JOSE MARES
Site address
2615 ALLAN LAKE LN
City
SPRING
State
TX
ZIP
77388
Mailing
7210 SEVILLE ST, HOUSTON, TX 77016
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

4 citations on file for this inspection.

1926.28 A

Serious Gravity 5 1 instance 3 exposed
Issued
Jun 17, 2013
Abate by
Jun 19, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1926.28(a): The employer did not require the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions.  The employer does not require employees to wear appropriate personal protective equipment when employees are exposed to chemical burns. This violation was observed on or about March13, 2013 at the construction site where employees were exposed to the hazard of chemical burns while mixing Holcim cement without gloves.   Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that employees are wearing gloves when they are mixing Holcim Cement.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.102 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Jun 17, 2013
Abate by
Jun 19, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents.  The employer does not protect employees from eye injuries. This violation was observed on or about March 13, 2013 at the construction site where employees were exposed to eye inurjuries when mixing Holcim cement.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that when employees are mixing Holcim cement they are wearing eye protection.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B01

Serious Gravity 5 1 instance 3 exposed
Issued
Jun 17, 2013
Abate by
Jun 19, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights;   The employer does not ensure that the platforms on all working levels of scaffolds are fully planked, exposing employees to fall hazards. This violation was observed on or about March 13, 2013 at the construction site where employees were exposed to a 14 foot fall hazard while on a working level that had an 18 inch space that was not fully planked.       Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all working levels of scaffolds are fully planked.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1926.451 G01 VII

Serious Gravity 10 1 instance 3 exposed
Issued
Jun 17, 2013
Abate by
Jun 19, 2013
Penalty
Initial $2,800 · Current $1,680 Reduced
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  The employer does not protect employees from falling when working more than 10 feet above a lower level. This violation was observed on or about March 13, 2013 at the construction site where employees were exposed to a 14 foot fall hazard when employees were on a fabricated frame scaffold and were not protected by the use of a personal fall arrest system or a guardrail system.      Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that  employees using scaffolds are provided with fall protection.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

View Jose Mares's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338958010.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.