CLEARFIELD, PA ·
OSHA Inspection: BUILDING SYSTEMS, INC.
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of BUILDING SYSTEMS, INC. in 1 SOUTH 2ND STREET, CLEARFIELD, PA 16830 (NAICS 236220). OSHA activity number 339087199.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BUILDING SYSTEMS, INC.
- Site address
- 1 SOUTH 2ND STREET
- City
- CLEARFIELD
- State
- PA
- ZIP
- 16830
- Mailing
- 7335 OLD PERRY HIGHWAY, ERIE, PA 16509
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 2
- Ownership type
- Private (A)
Citations
1 citation on file for this inspection.
1910.1200 E01
- Issued
- Aug 15, 2013
- Abate by
- Sep 19, 2013
- Penalty
- Initial $0 · Current $0
0577W103
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met (Construction Reference: 1926.59): a.) Building Systems, Inc., 1 South 2nd Street, Clearfield, PA- On or about May 23, 2013 , the written Hazard Communication Program was not available at the worksite nor was there a method/procedure in place to ensure the program could be provided to employee(s) requesting access to the program while conducting work operations at job sites. Company employees worked with and around hazardous chemicals including, but not limited to, Portland Cement and wood dust. b.) Building Systems, Inc., 1 South 2nd Street, Clearfield, PA- On or about May 23, 2013, and at times prior thereto, company employees worked with and around hazardous chemicals including but not limited to, Portland Cement and wood dust. The company's written Hazard Communication Program was missing information including, but not limited to, the following: 1.) The designation of a person responsible for overall in-plant/on-site compliance with the Company's Hazard Communication Program; 2.) The designation of a person responsible for ensuring proper labeling on incoming chemical containers; 3.) The description of the labeling system used in the plant/on job sites; 4.) The procedures to review and update label information when necessary; 5.) The designation of a person responsible for obtaining and maintaining MSDSs; 7.) A description of how the MSDSs are maintained in the plant/on job sites; 8.) A description of the training program to be used.
Recent events (1)
- · Z (O) $0
More inspections at Building Systems, INC.
View Building Systems, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339087199.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.