OSHA Inspection: STEPHEN DAVIS CONSTRUCTION, INC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of STEPHEN DAVIS CONSTRUCTION, INC in 1900 JACKSON ST., NW, WASHINGTON, DC 20018 (NAICS 238130). OSHA activity number 339516643.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stephen Davis Construction, INC — free Get an email when a new federal OSHA severe-injury report for Stephen Davis Construction, INC is published. One employer, no account, unsubscribe in one click.
Site address
1900 JACKSON ST., NW
City
WASHINGTON
State
DC
ZIP
20018
Mailing
1831 SOMERVILLE DR., MCLEAN, VA 22101
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
3
Ownership type
A

8 citations on file for this inspection.

1926.100 A

Serious Gravity 1 2 instances 2 exposed
Issued
Jan 30, 2014
Penalty
Initial $1,200 · Current $900 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:   a) The employee on the porch roof of the structure was pulling trusses through the window without head protection exposed to overhead struck-by hazards, on or about 12/11/13.   b) The owner was entering and exiting the structure through the main entrance without head protection while his employee was overhead setting roof trusses exposed to struck-by hazards, on or about 12/11/13.
Recent events (2)
  • — I (S) $900
  • — Z (S) $1200

1926.102 A01

Serious Gravity 1 2 instances 4 exposed
Issued
Jan 30, 2014
Abate by
Feb 5, 2014
Penalty
Initial $1,200 · Current $900 Reduced
29 CFR 1926.102(a)(1): Eye and face protective equipment were not provided when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:   a) An employee on the porch roof of the structure was using a pneumatic nail gun without eye protection exposing him to struck-by hazards, on or about 12/11/13.   b) Employees were on the multi-level decks using pneumatic nail guns and circular saws without eye protection exposing them to struck-by hazards, on or about 01/13/14.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $900
  • — Z (S) $1200

1926.405 A02 II I

Serious Gravity 1 3 instances 5 exposed
Issued
Jan 30, 2014
Abate by
Feb 5, 2014
Penalty
Initial $1,200 · Current $900 Reduced
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables were not protected from damage.   a) Employee  used an orange and black extension cord to power a reciprocating saw, in the basement, that had the main sheathing pulled away in multiple places  exposing the employee to electrical hazards, on or about 01/13/14.   b) Employees on the first level used an orange extension cord to power a circular saw that had the main sheathing pulled away in multiple places, exposing the employees to electrical hazards, on or about 01/13/14.   c) Employees on the second level used an orange and black extension cord to power a circular saw that had the main sheathing pulled away in multiple places, exposing the employees to electrical hazards, on or about 01/13/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $900
  • — Z (S) $1200

1926.405 G02 IV

Serious Gravity 1 2 instances 3 exposed
Issued
Jan 30, 2014
Abate by
Feb 5, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:   a) Employee was using a general contractor supplied orange extension cord on the basement level with the sheathing pulled away from the plug attachment exposing the employee to electrical hazards, on or about 01/13/14.   b) Employees on the first level were using an orange extension cord with the sheathing pulled away from the plug attachment exposing the employees to electrical hazards, on or about 01/13/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B13

Serious Gravity 10 1 instance 5 exposed
Issued
Jan 30, 2014
Penalty
Initial $2,800 · Current $2,100 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a) The employee working from the second level of the structure installing roof trusses for the porch without fall protection was exposed to a fall hazard of approximately 10 feet 11 inches, on or about 12/11/13.   b) Employees working from the first and second level decks of the structure installing rails without fall protection were exposed to a fall hazard of approximately 10 feet 4 inches to 21 feet, on or about 01/13/14
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2800

1926.1053 B13

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 30, 2014
Abate by
Feb 5, 2014
Penalty
Initial $1,600 · Current $1,200 Reduced
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step:   a) An employee on the first level was using the top of the four foot stepladder as a step exposing him to fall hazards, on or about 01/13/14.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $1600

1926.1053 B16

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 30, 2014
Abate by
Feb 5, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(16): Portable ladders with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, were not either immediately marked in a manner that readily identifies them as defective, or tagged with "Do Not Use" or similar language, and were not withdrawn from service until repaired:   a) An employee on the first level was using a four foot stepladder with a crossbrace pulled away from the ladder frame was exposed to fall hazards, on or about 01/13/14.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.405 B02

Other-than-serious 3 instances 5 exposed
Issued
Jan 30, 2014
Abate by
Feb 5, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.405(b)(2): In an energized installation, each outlet box did not have a cover, faceplate, or fixture canopy:  a) Employee was using a general contractor supplied orange extension cord on the basement level plugged into a GFCI protected outlet with no cover exposing the employee to electrical hazards, on or about 01/13/14.  b) Employees on the first level were using an orange extension cord plugged into a GFCI protected outlet with no cover exposing the employees to electrical hazards, on or about 01/13/14.  c) Employees on the second level were using an orange and black extension cord plugged into a GFCI protected outlet with no cover exposing the employees to electrical hazards, on or about 01/13/14.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Stephen Davis Construction, INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339516643.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.