OSHA Inspection: STEPHEN DAVIS CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STEPHEN DAVIS CONSTRUCTION, INC. in 1351 WISCONSIN AVENUE, NW, WASHINGTON, DC 20007 (NAICS 238130). OSHA activity number 340482611.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stephen Davis Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Stephen Davis Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1351 WISCONSIN AVENUE, NW
City
WASHINGTON
State
DC
ZIP
20007
Mailing
1831 SOMERVILLE DRIVE, MCLEAN, VA 22101
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
6
Ownership type
A

6 citations on file for this inspection.

1926.25 A

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 9, 2015
Penalty
Initial $1,600 · Current $880 Reduced
29 CFR 1926.25(a): During the course of construction, alteration, or repairs,  debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures:    a) Exterior Rear Entrance - An employee was observed using an access way into the building and the ground was cluttered with loose brick and metal roofing material and exposed the employee to a trip and fall hazard, on or about 03/19/2015.
Recent events (2)
  • — I (S) $880
  • — Z (S) $1600

1926.95 A

Serious Gravity 5 1 instance 6 exposed
Issued
Apr 9, 2015
Penalty
Initial $1,600 · Current $880 Reduced
29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact:    a) Rear Alleyway - Employees were observed breaking off hardened mortar from bricks using hammers and were not wearing safety glasses, on or about 03/19/2015.
Recent events (2)
  • — I (S) $880
  • — Z (S) $1600

1926.404 F06

Serious Gravity 1 1 instance 1 exposed
Issued
Apr 9, 2015
Penalty
Initial $1,200 · Current $660 Reduced
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous:    a) Second Floor - Employee was using a Makita portable electric saw to cut wooden framing members and the two extension cords used to provide power were missing the ground pins, 120 volt, 15 amps service, on or about 03/19/2015.
Recent events (2)
  • — I (S) $660
  • — Z (S) $1200

1926.416 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 9, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used:  a) Second Floor - An employee was using a Makita portable electric saw to cut wooden framing members and the extension cords used to provide power were frayed with exposed copper wiring, 120 volt, 15 amp service, on or about 03/19/2015.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.403 I02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 9, 2015
Abate by
Apr 15, 2015
Penalty
Initial $1,600 · Current $880 Reduced
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph:    a) Basement - Employees were using a temporary service panel to turn on lighting and receptacle outlets and several blank circuit breaker openings were not covered, exposing employees to live electrical parts, 120 volt service, on or about 03/19/2015.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $880
  • — Z (S) $1600

1926.501 B13

Repeat Gravity 10 2 instances 3 exposed
Issued
Apr 9, 2015
Abate by
Apr 15, 2015
Penalty
Initial $5,600 · Current $3,640 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):    a) Third Floor North Side - Foreman was observed standing near the edge of the floor while lifting a floor joist, without using fall protection and exposed to an 8 ft., to an adjoining property roof, on or about 03/19/2015.    b) Second Floor - Employees were shaking out new floor joists to span an opening without using fall protection and exposed to a 19 ft., fall hazard, on or about 03/19/2015.    Steven Davis Construction, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501(b)(13), which was contained in OSHA inspection number 951664, citation number 1, item number 4, and was affirmed as a final order on 02/25/14, with respect to a workplace located at 1900 Jackson Street NW, Washington DC.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (R) $3640
  • — Z (R) $5600

View Stephen Davis Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340482611.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.