HOUSTON, TX ·
OSHA Inspection: LINO HINOJOSA
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of LINO HINOJOSA in 3100 HAWKINS ST., HOUSTON, TX 77004 (NAICS 238140). OSHA activity number 339584278.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- LINO HINOJOSA
- Site address
- 3100 HAWKINS ST.
- City
- HOUSTON
- State
- TX
- ZIP
- 77004
- Mailing
- 7607 JAPONICA ST., HOUSTON, TX 77012
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 2
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.20 B02
- Issued
- Mar 28, 2014
- Abate by
- Apr 1, 2014
- Penalty
- Initial $3,080 · Current $1,848 Reduced
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person: a) At the worksite where frequent and regular inspections of the job site had not been performed.
Recent events (2)
- · I (S) $1848
- · Z (S) $3080
1926.451 F07
- Issued
- Mar 28, 2014
- Abate by
- Apr 14, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the worksite, where a competent person had not overseen the erection and alteration of a tubular welded frame scaffold.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.451 B01
- Issued
- Mar 28, 2014
- Abate by
- Apr 1, 2014
- Penalty
- Initial $2,640 · Current $1,584 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no more than 1 inch wide: a) On the east side of the building, where a tubular welded scaffolding system had was not fully planked on the fourth and fifth tiers. Employees were applying stucco from these levels.
Recent events (2)
- · I (S) $1584
- · Z (S) $2640
1926.451 C01 II
- Issued
- Mar 28, 2014
- Abate by
- Apr 1, 2014
- Penalty
- Initial $3,080 · Current $1,848 Reduced
General-duty citation text
29 CFR 1926.451(c)(1)(ii): Guys, ties, and/or braces were not installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and repeated vertically at locations of horizontal members every 20 feet (56.1 m) or less thereafter for scaffolds 3 feet ((0.91 m) wide or less, and every 26 feet (7.9 m) or less therafter for scaffolds greater than 3 feet (0.91m) wide: a) On the east side of the building, where a 3-foot wide tubular welded frame scaffold was not restrained from tipping at 12 feet and 31 feet.
Recent events (2)
- · I (S) $1848
- · Z (S) $3080
1926.451 C02
- Issued
- Mar 28, 2014
- Abate by
- Apr 2, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a) At the worksite, a 3 foot wide tubular welded scaffolding system was not supported by adequate base plates or mud sills.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.451 E01
- Issued
- Mar 28, 2014
- Abate by
- Apr 1, 2014
- Penalty
- Initial $1,760 · Current $1,056 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: a) At the worksite, a 3 foot wide , 5 tier high tubular welded scaffolding system was not provided with a safe means of accessing platforms.
Recent events (2)
- · I (S) $1056
- · Z (S) $1760
More inspections at Lino Hinojosa
View Lino Hinojosa's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339584278.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.