NAPOLEON, OH —
OSHA Inspection: CLOVERLEAF COLD STORAGE COMPANY
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of CLOVERLEAF COLD STORAGE COMPANY in 1165 INDUSTRIAL DRIVE, NAPOLEON, OH 43545 (NAICS 493110). OSHA activity number 339593212.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CLOVERLEAF COLD STORAGE COMPANY
- Site address
- 1165 INDUSTRIAL DRIVE
- City
- NAPOLEON
- State
- OH
- ZIP
- 43545
- Mailing
- 1165 INDUSTRIAL DRIVE, NAPOLEON, OH 43545
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 493110
- Employees
- 15
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.119 D03 I B
- Issued
- Jul 23, 2014
- Abate by
- Sep 15, 2014
- Penalty
- Initial $7,000 · Current $3,850 Reduced
0170
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process: Cloverleaf Cold Storage Company, Napoleon, Ohio: As of and prior to February 20, 2014, the employer did not ensure that their P&IDs were up-to-date and accurate. Inaccuracies included but were not limited to: a) The relief vent for relief header RV-638, P&ID 7W5-612, was not included on the diagram. b) The relief vent for relief header RV-646, P&ID 7W5-612, was not included on the diagram. c) Piping system, RV-610 is no longer connected to RV-609 on P&ID 7W5-171. d) The pressure relief valve protecting vessel SD-302, P&ID 7W5 VB-320, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. e) The pressure relief valve protecting vessel SD-303, P&ID 7W5 VB-321, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. f) The pressure relief valve protecting vessel SD-304, P&ID 7W5 VB-322, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. g) The pressure relief valve protecting vessel SD-305, P&ID 7W5 VB-323, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. h) The pressure relief valve protecting vessel SD-306, P&ID 7W5 VB-324, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. i) The pressure relief valve protecting vessel SD-307, P&ID 7W5 VB-325, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. j) The pressure relief valve protecting vessel SD-308, P&ID 7W5 VB-326, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. k) The pressure relief valve protecting vessel SD-309, P&ID 7W5 VB-327, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. l) The pressure relief valve protecting vessel SD-310, P&ID 7W5 VB-328, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. m) The pressure relief valve protecting vessel SD-311, P&ID 7W5 VB-329, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. n) The pressure relief valve protecting vessel SD-3012, P&ID 7W5 VB-330, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. o) The pressure relief valve protecting vessel SD-313, P&ID 7W5 VB-331, was indicated as being a single relief valve but a dual relief valve was installed on the vessel. q) The P&IDs did not reflect that twenty-two manual valves were capped or plugged to prevent ammonia release. The valves included but were not limited to, valves L6, L7, and L8 on P&ID 7W5-1010, valves G9 and G10 on P&ID 7W5-855, and valves D1 on each of the evaporators.
Recent events (2)
- — I (S) $3850
- — Z (S) $7000
1910.119 F01 I A
- Issued
- Jul 23, 2014
- Abate by
- Sep 15, 2014
- Penalty
- Initial $7,000 · Current $3,850 Reduced
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(A): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information for and did not address at least the following element: initial startup. Cloverleaf Cold Storage Company, Napoleon, Ohio: As of and prior to February 20, 2014, the employer did not develop and implement written operating procedures for normal operations that provide clear instructions for operating the ammonia refrigeration system including but not limited to: a) The procedure, SOP-LT-510, for operation of LT-510 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. b) The procedure, SOP-LT-511, for operation of LT-511 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. c) The procedure, SOP-LT-512, for operation of LT-512 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. d) The procedure, SOP-HT-610, for operation of HT-610 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. e) The procedure, SOP-HT-611, for operation of HT-611 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. f) The procedure, SOP-HT-612, for operation of HT-612 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. g) The procedure, SOP-HT-613, for operation of HT-613 ammonia compressor did not provide specific information on which valves to open and which valves to close when pumping out the compressor. h) The procedure, SOP-7W5-500, for operation of ammonia liquid accumulator, 7W5-500, and pumps, did not provide specific information on which valves to open and which valves to close during startup. i) The procedure, SOP-HE-920, for operation of ammonia heat exchanger, HE-920, did not provide specific information on which valves to open and which valves to close during startup. j) The procedure, SOP-HE-1010, for operation of ammonia heat exchanger, HE-1010, did not provide specific information on which valves to open and which valves to close during startup. k) The procedure, SOP-LT-511, for operation of LT-511 ammonia compressor incorrectly directs the person to ensure that valve L3 is closed. There is no valve on compressor LT-511 designated as L3. l) The procedure, SOP-HT-611, for operation of HT-611 ammonia compressor incorrectly directs the person to open pump out valve G2. There is no valve on compressor HT-611 designated as G2. m) The procedure, SOP-HE-920, for operation of ammonia heat exchanger, HE-920 on P&ID 7W5-920, incorrectly directs the person to open valve L5. There is no valve on HE-920 designated as L5.
Recent events (2)
- — I (S) $3850
- — Z (S) $7000
1910.119 L01
- Issued
- Jul 23, 2014
- Abate by
- Sep 15, 2014
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not implement procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process: Cloverleaf Cold Storage Company, Napoleon, Ohio: As of and prior to May 20, 2014, the employer did not ensure that the management of change procedure was implemented for changes made to the ammonia system. Changes that were made to the system include, but were not limited to: a) The emergency stop controls located inside the building near the mechanical room (engine room) were removed.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Cloverleaf Cold Storage Company
View Cloverleaf Cold Storage Company's full OSHA safety record →
More inspections in this industry (NAICS 493110)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339593212.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.