OSHA Inspection: ARGUETA CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ARGUETA CONSTRUCTION, LLC in 1327 CONSTITUTION AVE., NE, WASHINGTON, DC 20002 (NAICS 238170). OSHA activity number 339746513.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Argueta Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Argueta Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
1327 CONSTITUTION AVE., NE
City
WASHINGTON
State
DC
ZIP
20002
Mailing
409 S. GEORGE MASON DR., ARLINGTON, VA 22204
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
4
Ownership type
A

4 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 12, 2014
Abate by
Aug 30, 2014
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):   a)  Back Yard - On or about 04/28/2014, siding mechanics were exposed to a 13 foot fall from the platform of a pump jack scaffold which was not fully planked between the scaffolds vertical uprights.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

1926.451 F07

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 12, 2014
Abate by
Aug 30, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:   a)  Back Yard - On or about 04/28/2014, the site foremen and designated competent person supervised the erection and use of a pump jack scaffold which was not provided with adequate planking or fall protection.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.451 H02 I

Serious Gravity 5 1 instance 3 exposed
Issued
Aug 12, 2014
Abate by
Aug 30, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(h)(2)(i): The area below the scaffold was not barricaded, and employees were not prohibited from entering the hazard area:   a:  Back Yard - On or about 04/28/2014, the area beneath a pump jack scaffold was not barricaded nor were workers observed walking beneath the scaffold platform protected from falling tools or materials by other effective means.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.502 D06 I

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 12, 2014
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.502(d)(6)(i): A snaphook of the locking type was not designed to be directly attached or engaged to a rope and/or a  horizontal lifeline:   a)  On or about 04/28/2014, locking snaphooks which were part of personal fall protections system were attached directly to independent lifelines and not specifically designed for that application.
Recent events (1)
  • — Z (S) $1600

View Argueta Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339746513.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.