Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: J.J. RIERA CONSTRUCTION LLC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of J.J. RIERA CONSTRUCTION LLC in 21 COLLINS AVENUE, WESTERLY, RI 02891 (NAICS 236118). OSHA activity number 339786287.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J.J. Riera Construction LLC — free Get an email when a new federal OSHA severe-injury report for J.J. Riera Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
21 COLLINS AVENUE
City
WESTERLY
State
RI
ZIP
02891
Mailing
14 SANDY BROOK RD, CLINTON, CT 06413
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
5
Ownership type
A

2 citations on file for this inspection.

1926.451 B01 I

Serious Gravity 5 1 instance 5 exposed
Issued
Nov 13, 2014
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:    (i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) not installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform):    Worksite: Where employees worked from, scaffolding in excess of 10 feet above ground level, the employer did not ensure that the working surface was fully planked to prevent employees falling to the ground below.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.451 B07

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 13, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(7): On scaffolds where platforms are overlapped to create a long platform, the overlap did not occur only over supports, and was not less than 12 inches (30 cm) unless the platforms were nailed together or otherwise restrained to prevent movement:  Worksite: Where the employer overlapped platforms to create one long platform, the overlap occurred on areas not over supports, was greater than 12 inches, and the platforms were not nailed together or otherwise restrained to prevent movement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View J.J. Riera Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339786287.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.