OSHA Inspection: RNV CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RNV CONSTRUCTION in GARAPAN WATER QUALITY RESTORATION PROJECT KALACHUCHA AVENUE, VILLAGE OF GARAPAN, SAIPAN, MP 96950 (NAICS 237310). OSHA activity number 340744143.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch RNV Construction — free Get an email when a new federal OSHA severe-injury report for RNV Construction is published. One employer, no account, unsubscribe in one click.
Establishment
RNV CONSTRUCTION
Site address
GARAPAN WATER QUALITY RESTORATION PROJECT KALACHUCHA AVENUE, VILLAGE OF GARAPAN
City
SAIPAN
State
MP
ZIP
96950
Mailing
PO BOX 504974 CHALAN KANOA, SAIPAN, MP 96950
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237310
Employees
100
Ownership type
A

1 citation on file for this inspection.

1926.200 G02

Serious Gravity 5 1 instance 7 exposed
Issued
Jul 27, 2015
Abate by
Aug 4, 2015
Penalty
Initial $2,380 · Current $2,380
29 CRF 1926.200(g)(2): All traffic control signs or devices used for protection of construction workers did not conform to Part VI of the Manual on Uniform Traffic Control Devices (MUTCD), 1988 Edition, Revision 3, September 3, 1993, FHWA-SA-94-027 or Part VI of the Manual on Uniform Traffic Control Devices, Millennium Edition, December 2000, FHWA, which are incorporated by reference:  On Kalachucha Avenue in Garapan, Saipan, traffic control did not conform to Part VI of the Manual on Uniform Traffic Control Devices, Millennium Edition December 2000, FHWA. The project foreman said he set up the traffic control and wanted to close the road but they needed to allow local traffic to pass.  The foreman did not produce the project plans submitted to the Commonwealth Utilities Corporation which usually contain the traffic control plan that comply with the MUTCD.  The traffic control did not follow the MUTCD Typical Application 18, lane closure on Minor Street, as there were no Channelizing Devices to mark and direct traffic for a Transition Area and Work Space.  The traffic control did not follow the MUTCD Typical Application 19, Detour for One Travel Direction, as there were no Channelizing Devices to mark and direct traffic away from the Work Space and there were no Type III Barricades at the ends of the Work Space where traffic approached the Work Space.  Employees working and walking in the Work Space were exposed to the hazard of being struck by vehicles.
Recent events (1)
  • — Z (S) $2380

View RNV Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340744143.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.