OSHA Inspection: C & D WATERPROOFING CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of C & D WATERPROOFING CORPORATION in RYAN BUILDING 451 NORTH 3RD STREET, HARRISBURG, PA 17120 (NAICS 238160). OSHA activity number 340780170.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch C & D Waterproofing Corporation — free Get an email when a new federal OSHA severe-injury report for C & D Waterproofing Corporation is published. One employer, no account, unsubscribe in one click.
Site address
RYAN BUILDING 451 NORTH 3RD STREET
City
HARRISBURG
State
PA
ZIP
17120
Mailing
300 PAPERMILL ROAD, BLOOMSBURG, PA 17815
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
3
Ownership type
A

2 citations on file for this inspection.

1926.451 B03

Other-than-serious 1 instance 2 exposed
Issued
Jan 12, 2016
Abate by
Feb 8, 2016
Penalty
Initial $2,100 · Current $2,100
29 CFR 1926.451(b)(3): The front edge of all platforms was not 14 inches (36 cm) or less from the face of the work, and no guardrail systems were erected along the front edge and/or no personal fall arrest systems were used in accordance with paragraph (g) of this section to protect employees from falling.    (a)  Ryan Building - An employee worked on scaffolding along the face of the building painting.  The employer did not ensure that the front edge of the platforms were 14 inches or less from the face of the work, on or about July 16, 2015.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $2100
  • — Z (S) $2100

1926.451 F03

Other-than-serious 1 instance 2 exposed
Issued
Jan 12, 2016
Abate by
Feb 8, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    (a)  Ryan Building  - An employee worked on scaffolding along the face of the building, painting.  The employer did not ensure that the scaffolding was adequately inspected for decencies prior to use, on or about July 16, 2015.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

View C & D Waterproofing Corporation's full OSHA safety record →