YORK, PA —
OSHA Inspection: REAM ROOFING ASSOCIATES, INC.
Federal Agency inspection · Safety discipline
At a glance
On , OSHA opened a federal Agency safety inspection of REAM ROOFING ASSOCIATES, INC. in 305 S RICHLAND AVENUE, YORK, PA 17404 (NAICS 238160). OSHA activity number 342055910.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- REAM ROOFING ASSOCIATES, INC.
- Site address
- 305 S RICHLAND AVENUE
- City
- YORK
- State
- PA
- ZIP
- 17404
- Mailing
- P.O. BOX 9, DALLASTOWN, PA 17313
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 43
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.501 B04 I
- Issued
- Jul 20, 2017
- Abate by
- Aug 15, 2017
- Penalty
- Initial $9,760 · Current $7,808 Reduced
General-duty citation text
29 CFR 1926.501(b)(4)(i): Each employee on walking/working surfaces was not protected from falling through holes (including skylights), more than six feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes: a) 305 S Richland Ave - The employer did not protect employees who were removing and installing sheathing from falling through holes by ensuring the use of personal fall arrest systems, covers or guardrails, thereby, exposing employees to falls 19 feet to the floor below on or before January 26, 2017. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (S) $7808
- — C (S) $9760
- — Z (S) $9760
1926.503 A01
- Issued
- Jul 20, 2017
- Abate by
- Sep 6, 2017
- Penalty
- Initial $8,873 · Current $7,098 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) 305 S Richland Ave - The employer did not ensure that employees working on the roof were trained to recognize fall hazards, thereby exposing employees to injuries on or before January 26, 2017. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (S) $7098.4
- — C (S) $8873
- — Z (S) $8873
1926.501 B10
- Issued
- Jul 20, 2017
- Abate by
- Aug 15, 2017
- Penalty
- Initial $126,749 · Current $101,399 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system: a) 305 S Richland Ave - Employees conducting work on a commercial roof with a 4/12 pitch and working between heights of 11 feet and 19 feet were not protected from falling by personal fall arrest system, thereby, exposing employees to fall hazards of 19 feet to the ground below on or before January 25, 2017 Ream Roofing was previously cited for a violation of this occupational safety and health standard 1926.501(b)(10) which was contained in OSHA inspection number 1116725 citation number 1 item number 2 and was affirmed as a final order on March 9, 2016 with respect to a workplace located at 7132 Ruppsville Road, Allentown, Pa. Ream Roofing was previously cited for a violation of this occupational safety and health standard or its equivalent standard 1926.451(g)(1), which was contained in OSHA inspection number903839, citation number 1, item number 5 and was affirmed as a final order on August 22, 2013, with respect to a workplace located at 472 East Locust Street Ste 4 Dallastown PA 17313. Ream Roofing was previously cited for a violation of this occupational safety and health standard, which was contained in OSHA Inspection Number 308479609, Citation Number 2, Item Number 1 and was affirmed as a final order on December 21, 2006, with respect to a workplace located at 31 South Broad Street, York, PA 17405. Ream Roofing was previously cited for a violation of this occupational safety and health standard, which was contained in OSHA Inspection Number 308479229, Citation Number 1, Item Number 1 and was affirmed as a final order on October 24, 2006, with respect to a workplace located at 550 Homestead Road, Hershey, PA 17033. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- — F (R) $101399.2
- — C (W) $126749
- — Z (W) $126749
1926.503 B01
- Issued
- Jul 20, 2017
- Abate by
- Sep 6, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. a) 305 South Richland Ave - The employer did not certify that the five (5) Ream Roofing employees working on the roof were trained to recognize fall hazards on or about January 26, 2017. b) 305 South Richland Ave - The employer did not certify that the two (2) employees borrowed from NRC roofing were trained to recognize fall hazards on or about January 26, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Ream Roofing Associates, INC.
View Ream Roofing Associates, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342055910.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.