LEBANON, PA —
OSHA Inspection: DEBLIN INCORPORATED
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of DEBLIN INCORPORATED in BRIDGE NEAR 2266 QUENTIN ROAD, LEBANON, PA 17042 (NAICS 237310). OSHA activity number 342391711.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DEBLIN INCORPORATED
- Site address
- BRIDGE NEAR 2266 QUENTIN ROAD
- City
- LEBANON
- State
- PA
- ZIP
- 17042
- Mailing
- 4913 GETTYSBURG ROAD, MECHANICSBURG, PA 17055
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237310
- Employees
- 35
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.501 B01
- Issued
- Jun 22, 2017
- Abate by
- Jul 19, 2017
- Penalty
- Initial $5,070 · Current $3,803 Reduced
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: a) Top Of Form - An employee vibrating concrete was exposed to an approximate ten (10) foot fall hazard without the use of a guardrail system, safety net system or personal fall arrest system, on or about June 12th, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3802.5
- — Z (S) $5070
1926.1412 E01
- Issued
- Jun 22, 2017
- Abate by
- Jul 19, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1412(e)(1): 29 CFR 1926.1412(e)(1): The equipment in service was not inspected each month in accordance with paragraph (d) of this section (each shift): a) Site - The employer did not perform an equipment service inspection on a monthly basis on equipment that was in service and in use, on or about June 12th, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Deblin Incorporated
View Deblin Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 237310)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342391711.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.