OSHA Inspection: ARSENAL SCAFFOLD, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ARSENAL SCAFFOLD, INC. in 537 GREENWICH STREET, NEW YORK, NY 10013 (NAICS 238990). OSHA activity number 342400835.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Arsenal Scaffold, INC. — free Get an email when a new federal OSHA severe-injury report for Arsenal Scaffold, INC. is published. One employer, no account, unsubscribe in one click.
Site address
537 GREENWICH STREET
City
NEW YORK
State
NY
ZIP
10013
Mailing
95 JERSEY STREET, WEST BABYLON, NY 11704
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238990
Employees
50
Ownership type
A

3 citations on file for this inspection.

1926.302 A02

Other-than-serious 1 instance 2 exposed
Issued
Nov 15, 2017
Penalty
Initial $5,577 · Current $5,300 Reduced
29 CFR 1926.302(a)(2): The use of electric cords for hoisting or lowering tools was permitted:       a) 537 Greenwich Street, west side of building, on or about 6-7-17:  One employee used the power cord to lower a rotary hammer drill from an elevated scaffold platform to the ground.
Recent events (3)
  • — F (O) $5300
  • — C (S) $5577
  • — Z (S) $5577

1926.451 G04 XV

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Nov 15, 2017
Penalty
Initial $6,972 · Current $0 Reduced
29 CFR 1926.451(g)(4)(xv): Crossbracing used in place of a midrail was unacceptable because the crossing point of two braces is between 20 inches (0.5 m) and 30 inches ((0.8 M) above the work platform or as a toprail when the crossing point of two braces is not between 20 inches (0.5 m) and 30 inches (0.8 m) above the work platform or as a toprail when the crossing point of two braces is between 38 inches (0.97 m) and 48 inches (1.3 m) above the work platform:    a) 537 Greenwich Street, west side of building, on or about 6-7-17:  Two employees were erecting scaffolding on a scaffold system with cross braces used as a full guardrail system, exposing the employee to a fall hazard of 85 feet 4 inches to the sidewalk below.
Recent events (3)
  • — F (S) $0
  • — C (S) $6972
  • — Z (S) $6972

1926.1053 B01

Other-than-serious 1 instance 2 exposed
Issued
Nov 15, 2017
Penalty
Initial $6,972 · Current $6,600 Reduced
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:       a) 537 Greenwich Street, west side of building, on or about 6-7-17:  Employees were accessing a scaffold using a ladder that was 19 inches above the landing surface, exposing the employees to a fall hazard of  17 feet 10 inches.
Recent events (3)
  • — F (O) $6600
  • — C (S) $6972
  • — Z (S) $6972

View Arsenal Scaffold, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342400835.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.