Planned inspection · Health discipline

On , OSHA opened a planned health inspection of CENTRAL METAL FINISHING INC in 80 FLAGSHIP DRIVE, NORTH ANDOVER, MA 01845 (NAICS 332813). OSHA activity number 342411139.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Central Metal Finishing INC — free Get an email when a new federal OSHA severe-injury report for Central Metal Finishing INC is published. One employer, no account, unsubscribe in one click.
Site address
80 FLAGSHIP DRIVE
City
NORTH ANDOVER
State
MA
ZIP
01845
Mailing
80 FLAGSHIP DRIVE, NORTH ANDOVER, MA 01845
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332813
Employees
114
Ownership type
A

4 citations on file for this inspection.

1910.22 A02

Serious Gravity 5 1 instance 6 exposed
Issued
Oct 18, 2017
Abate by
Nov 22, 2017
Penalty
Initial $9,778 · Current $3,500 Reduced
29 CFR 1910.22(a)(2): The floor of each workroom was not maintained in a clean and, to the extent feasible, in a dry condition. Where wet processes were used, drainage was not maintained:      a) 80 Flagship Drive, North Andover, MA 01845      On or about July 19, 2017, the employer did not ensure that the floor in the central south plating room was maintained in a clean, and to the extent feasible, in a dry condition. The floor was coated with liquids used in the plating process, creating a surface that was slippery.       Abatement certification is required of this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $3500
  • — Z (S) $9778

1910.1027 D03 II

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Oct 18, 2017
Abate by
Nov 22, 2017
Penalty
Initial $11,408 · Current $0 Reduced
29 CFR 1910.1027(d)(3)(ii): The employer discontinued the monitoring based on readings taken that were not at least seven days apart:  a) 80 Flagship Drive, North Andover, 01845, central south plating room,  On or about July 19, 2017, the employer did not ensure that monitoring based on readings taken were at least 7 days apart. The employer conducted one sampling event for cadmium exposure, and did not perform a follow-up at least 7 days later. An employee conducing cadmium plating was exposed to cadmium at an 8-hour time-weighted average of 160 micrograms per cubic meter of air, approximately 32.682 times the Permissible Exposure Limit of 5 micrograms per cubic meter of air.  Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $0
  • — Z (S) $11408

1910.1027 F01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Oct 18, 2017
Abate by
Dec 15, 2018
Penalty
Initial $0 · Current $5,000
29 CFR 1910.1027(f)(1)(i): The employer did not implement engineering and work practice controls to reduce and maintain employee exposure to cadmium at or below the permissible exposure limit (PEL):      a) 80 Flagship Drive, North Andover, 01845, central south plating room,      On or about July 19, 2017, the employer did not ensure that engineering controls were reducing and maintaining employee exposure to cadmium at or below the permissible exposure limit. An employee conducing cadmium plating was exposed to cadmium at an 8-hour time-weighted average of 160 micrograms per cubic meter of air, approximately 32.682 times the Permissible Exposure Limit of 5 micrograms per cubic meter of air.      Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (2)
  • — I (S) $5000
  • — Z (S) $0

1910.1200 E01

Other-than-serious 1 instance 103 exposed
Issued
Oct 18, 2017
Abate by
Dec 15, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    a) 80 Flagship Drive, North Andover 01845    On or about June 15, 2017, the employer did not develop a written hazard communication program that describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met. The employer implemented the elements of the hazard communication program, but did not develop a hazard communication program to ensure that the program was properly implemented.     Abatement certification is required of this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Central Metal Finishing INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342411139.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.