Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,196,991Inspections Most recent open 2026-08-24 Last loaded 2026-08-27

OSHA Inspection: U.S. DEPT OF JUSTICE-BUREAU OF PRISONS

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of U.S. DEPT OF JUSTICE-BUREAU OF PRISONS in FEDERAL CORRECTIONAL COMPLEX OLD NC HWY 75, P. O. BOX 1600, BUTNER, NC 27509 (NAICS 922140). OSHA activity number 342559739.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch U.S. Dept of Justice-Bureau of Prisons for free Get an email when a new federal OSHA severe-injury report for U.S. Dept of Justice-Bureau of Prisons is published. One employer, no account, unsubscribe in one click.
Site address
FEDERAL CORRECTIONAL COMPLEX OLD NC HWY 75, P. O. BOX 1600
City
BUTNER
State
NC
ZIP
27509
Mailing
FEDERAL CORRECTIONAL COMPLEX OLD HWY 75, P. O. BOX 1600, BUTNER, NC 27509
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
Union (A)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
922140
Employees
750
Ownership type
Federal government (D)

10 citations on file for this inspection.

1910.22 D01

Serious Gravity 5 1 instance 8 exposed
Issued
Feb 9, 2018
Abate by
Mar 15, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.22(d)(1): The employer did not ensure that walking-working surfaces were inspected, regularly and as necessary, and maintained in a safe condition:  BOP FCC, FCI I Loading Dock:  On or about 08/15/2017, the employer did not ensure forklift operators had a safe working surface to deliver food goods to the institution where the outside pavement approach area to the loading dock was uneven, full of holes, deep cracks and asphalt debris from a crumbling working surface.   ABATEMENT CERTIFICATION REQUIRED.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1960.8 A

Serious Gravity 5 3 instances 60 exposed
Issued
Feb 9, 2018
Abate by
Mar 15, 2018
Penalty
Initial $0 · Current $0
The Agency head did not furnish to each employee employment and a place of employment which was free from recognized hazards that caused, or were likely to cause, death or serious physical harm to employees, in that; employees were exposed to struck-by and crush-by hazards.     BOP FCC, Food Warehouse Bldg.: On or about August 16, and times thereto, Metal tiered storage racks were observed with multiple damaged legs which affect the strength of the structural component.     ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1960.30 A

Deleted Serious Gravity 1 3 instances 50 exposed
Issued
Feb 9, 2018
Abate by
Mar 15, 2018
Penalty
Initial $0 · Current $0
29 CFR 1960.30(a):  The Agency did not ensure prompt abatement of unsafe and unhealthful conditions:   (a)   Butner, NC FCC, FCI I Health Services:  On or about 08/15/2017, the employer did not ensure prompt corrective action where visible mold and fungal was growth was identified in 2014 and two consultant reports recommended, at a minimum clean to clean all visible fungal growth, clean interior of air handlers on a maintenance schedule, and remove water from air handler and mechanical room floors, to conduct a visual inspection of the HVAC ductwork to identify potential fungal contamination. Employees complaints of health effects linked to mold exposure began prior to 2014 and continued to present.   (b)   Butner, NC FCC, FCI I Health Services:  On or about 08/15/2017, the employer did not ensure prompt corrective action where visible mold and fungal was growth was plainly visible and persistent roof leaks exist. Employees complaints of health effects linked to mold exposure began prior to 2014 and continued to present.    ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.303 B01 V

Serious Gravity 1 1 instance 5 exposed
Issued
Feb 9, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(1)(v): Safety of electrical equipment was not determined by considering heating effects under all conditions of use.  BOP FCC, Unicor Warehouse:  On or about 08/15/2017, ceiling light fixtures that were suspended from and plugged into a 600 volt feed rail being used by inmates was not installed to prevent heating effects to the cords and cables.    CORRECTED DURING INSPECTION
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.334 A02 II

Repeat Gravity 5 1 instance 1 exposed
Issued
Feb 9, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.334(a)(2)(ii): Defective or evidence of damage to cords that could have exposed an employee to injury was not removed from service:      BOP FCC, Cadre A Housing Area:  On or about August 14, 2017, an electric buffer power cord was damaged with the outer insulation separated, which exposed strands of bare copper wire.    The U.S. Department of Justice was previously cited a violation of this occupational safety and health standard 29 CFR 1910.334(a)(2)(ii), which is contained in OSHA inspection number 1170381, Notice 1 item 6 and was affirmed as a final order date on March 10, 2017, and was abated.   CORRECTED DURING INSPECTION
Recent events (2)
  • · I (R) $0
  • · Z (R) $0

1910.303 B02

Repeat 1 instance 1 exposed
Issued
Feb 9, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:      BOP FCC, Medical Center Cadre: On or about August 14, 2017, a Belkin re-locatable power tap, designed and listed for being used with high concentrations of low powered loads was instead used with high powered loads such as a mini fridge and Emerson microwave, and was mounted to an interior wall.     The U.S. Department of Justice was previously cited a violation of this occupational safety and health standard 29 CFR 1910.303(b)(2), which is contained in OSHA inspection number 1170381, Notice 1 Item 4 and was affirmed as a final order date on March 10, 2017, and was abated.   CORRECTED DURING INSPECTION
Recent events (2)
  • · I (R) $0
  • · Z (R) $0

1910.304 G05

Repeat 1 instance 20 exposed
Issued
Feb 9, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.304(g)(5):  The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:      BOP FCC, Unicor Warehouse:  On or about August 15, 2017, a pedestal fan, being used by employees to cool a part of the warehouse, had a missing ground pin.    The U.S. Department of Justice was previously cited a violation of this occupational safety and health standard 29 CFR 1910.304(g)(5), which is contained in OSHA inspection number 1091841, Notice 1 Item 3 and was affirmed as a final order date on November 16, 2015, and was abated.   CORRECTED DURING INSPECTION
Recent events (2)
  • · I (R) $0
  • · Z (R) $0

1910.305 G02 III

Repeat 2 instances 50 exposed
Issued
Feb 9, 2018
Abate by
Mar 15, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(iii):  Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws:      BOP FCC, Unicor Warehouse:  On or about August 14, 2017, the employer did not ensure that damaged pedestal fans were removed from service where the power cord strain relief had pulled away from the end plug fitting thereby exposing internal conductors.    The U.S. Department of Justice was previously cited a violation of this occupational safety and health standard 29 CFR 1910.305(g)(2)(iii), which is contained in OSHA inspection number 1170381, Notice 1 Item 5 and was affirmed as a final order date on March 10, 2017, and was abated.    ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • · I (R) $0
  • · Z (R) $0

1910.28 B11 II

Other-than-serious 1 instance 4 exposed
Issued
Feb 9, 2018
Abate by
Mar 15, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.28(b)(11)(ii): Each flight of stairs having at least 3 treads and at least 4 risers was not equipped with stair rail systems and handrails as required in Table D-2 of this standard:  BOP FCC, FCI I Health Services Bldg.:  On or about 08/16/2017, the employer did not ensure that the exterior stairway to the basement mechanical room where the HVAC system is located was equipped with a mid-rail.   ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1910.305 G01 IV A

Other-than-serious 1 instance 1 exposed
Issued
Feb 9, 2018
Abate by
Mar 8, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  BOP FCC: Unicor Warehouse:  On or about 8/15/2017, an extension cord that was physically affixed to a metal cage area using zip ties were being used in lieu of fixed wiring to power a small electrical floor fan.   ABATEMENT CERTIFICATION REQUIRED
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

View U.S. Dept of Justice-Bureau of Prisons's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 342559739.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.