OSHA Inspection: FRANCO PLASTERING, INC.

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of FRANCO PLASTERING, INC. in 1980 SAN MARCO RD, MARCO ISLAND, FL 34145 (NAICS 238310). OSHA activity number 342728813.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Franco Plastering, INC. — free Get an email when a new federal OSHA severe-injury report for Franco Plastering, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1980 SAN MARCO RD
City
MARCO ISLAND
State
FL
ZIP
34145
Mailing
3508 ENTERPRISE AVE SUITE 100, NAPLES, FL 34104
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
4
Ownership type
A

10 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $6,338 · Current $2,000 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:    On or about 10/25/2017, at the above address jobsite, the employee working on the third tier level  of a scaffold was not provided a hard hat to protect him from possible falling objects above him .
Recent events (2)
  • — I (S) $2000
  • — Z (S) $6338

1926.451 B01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $3,600
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary.    On or about 10/25/2017, at the above address jobsite, an employee was working on the fourth tier level of a scaffold with a space in between adjacent planks of approximately 5 inches.
Recent events (2)
  • — I (S) $3600
  • — Z (S) $0

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:  On or about 10/25/2017, at the above address jobsite, an employee was working on the fourth tier level of a scaffold that was erected by an employee who was not competent on scaffold erection.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. or alteration:  Instances:  1) On or about 10/25/2017, at the above address jobsite, an employee was working on the third tier level of a scaffold that was missing guardrails, exposing the employee to a fall hazard of approximately 18 ft.  2) On or about 10/25/2017, at the above address jobsite, an employee was working on the fourth tier level of a scaffold that was missing guardrails, exposing the employee to a fall hazard of approximately 25 ft.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 H01

Serious Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects:  On or about 10/25/2017, at the above address jobsite, an employee was working on the third tier level of a scaffold without toeboards in place to protect him from tools and equipment used on the fourth tier level above him.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B01

Repeat Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $12,676 · Current $8,000 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):    On or about 10/25/2017, at the above address jobsite, an employee was working on the fourth tier level of a scaffold that was not fully planked, exposing the employee to a fall hazard of approximately 25 ft.        The Franco Plastering, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 1926.451(b)(1), which was contained in OSHA inspection number 1144520, citation number 1, item number 1a and was affirmed as a final order on 7/26/2016, with respect to a workplace located at 7700 Tamiami Trail E Naples, FL 34113.
Recent events (2)
  • — I (R) $8000
  • — Z (R) $12676

1926.451 E01

Repeat Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.  On or about 10/25/2017, at the above address jobsite, an employee was working on the fourth tier level of a scaffold that was missing adequate means of access, exposing the employee to a fall hazard.    The Franco Plastering, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 1926.451(b)(1), which was contained in OSHA inspection number 1144520, citation number 1, item number 2 and was affirmed as a final order on 7/26/2016, with respect to a workplace located at 7700 Tamiami Trail E Naples, FL 34113.
Recent events (2)
  • — I (R) $0
  • — Z (R) $0

1926.454 A

Repeat Gravity 5 1 instance 1 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  On or about 10/25/2017, at the above address jobsite, an employee working from a scaffold was not given training by the employer on scaffold related hazards.  The Franco Plastering, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 1926.451(b)(1), which was contained in OSHA inspection number 1144520, citation number 1, item number 1b and was affirmed as a final order on 7/26/2016, with respect to a workplace located at 7700 Tamiami Trail E Naples, FL 34113.
Recent events (2)
  • — I (R) $0
  • — Z (R) $0

1910.1200 E01

Other-than-serious 1 instance 4 exposed
Issued
Dec 15, 2017
Penalty
Initial $711 · Current $200 Reduced
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program which at included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): (Construction Reference: 1926.59)     On or about 10/25/2017, at the above address jobsite, the employer did not implement a written hazard communication program for employees exposed to chemicals such as, but not limited to silica while conducting plastering work at the jobsite.
Recent events (2)
  • — I (O) $200
  • — Z (O) $711

1910.1200 G01

Other-than-serious 1 instance 4 exposed
Issued
Dec 15, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(1): The employer did not have a material safety data sheet for each hazardous chemical which they used: (Construction Reference: 1926.59)  On or about 10/25/2017, at the above address jobsite, the employer did not have available on-site the safety data sheet (SDS) for the Titan America stucco cement used by the plastering employees at the jobsite.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Franco Plastering, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342728813.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.