Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: REID ROOFING, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of REID ROOFING, INC. in 2141 N. DAYTON ST., CHICAGO, IL 60614 (NAICS 238160). OSHA activity number 342739919.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Reid Roofing, INC. — free Get an email when a new federal OSHA severe-injury report for Reid Roofing, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
REID ROOFING, INC.
Site address
2141 N. DAYTON ST.
City
CHICAGO
State
IL
ZIP
60614
Mailing
2432 IRVING PARK RD., CHICAGO, IL 60618
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

8 citations on file for this inspection.

1926.451 E01

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $5,692 · Current $5,692
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:  a)  On October 25, 2017, employees were exposed to a fall hazard of greater than 25 feet while accessing a ladder jack scaffold.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $5692
  • — Z (S) $5692

1926.452 K01

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $4,065 · Current $0 Reduced
29 CFR 1926.452(k)(1): Platforms exceeded a height of 20 feet (6.1 m):     a)  On October 25, 2017, employees were working from a ladder jack scaffold platform that exceeded 25 feet.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $4065

1926.451 G01 I

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $5,692 · Current $2,846 Reduced
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:  a)  On October 25, 2017, employees working from a ladder jack scaffold were exposed to a fall hazard of greater than 25 feet.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2846
  • — Z (S) $5692

1926.502 D01

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(1): Personal fall arrest system connectors were not drop forged, pressed or formed steel, or made of equivalent materials:     a) On October 25, 2017, employees were exposed to fall hazards while using personal fall arrest system components containing connectors that were not drop forged, pressed or formed steel.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.502 D16 II

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(16)(ii): Personal Fall Arrest Systems, when stopping a fall, would not limit maximum arresting force on an employee to 1,800 pounds (8 kN) when used with a body harness:   a)  On October 25, 2017, personal fall arrest systems used by employees did not have a shock absorbing lanyard to reduce the forces of a fall to below 1,800 pounds.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.502 D17

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.502(d)(17): The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head:  a)  On October 25, 2017, employees utilized the positioning D-rings at waist level of the their full body harnesses as the attachment point.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.454 A

Serious Gravity 5 1 instance 2 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $4,065 · Current $2,032 Reduced
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:     a)  On or about October 25, 2017, employees were not trained to recognize and eliminate the hazards associated with working from scaffolding.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $2032
  • — Z (S) $4065

1926.501 B13

Repeat Gravity 10 1 instance 1 exposed
Issued
Jan 26, 2018
Abate by
Feb 1, 2018
Penalty
Initial $11,383 · Current $3,430 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):    a)  On October 25, 2017, employees performing roofing work were exposed to fall hazards of greater than 25 feet.  Reid Roofing, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501(b)(13) which was contained in OSHA inspection number 1011332, citation 1, item 2, and was affirmed final order on March 4, 2015, with respect to a workplace located at 3056 N. Southport Ave., Chicago, IL 60657.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (R) $3430
  • — Z (R) $11383

View Reid Roofing, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342739919.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.