OSHA Inspection: BUILDING SYSTEMS, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of BUILDING SYSTEMS, INC. in 301 SOUTH FRONT STREET, HAMBURG, PA 19526 (NAICS 238140). OSHA activity number 342937851.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Building Systems, INC. — free Get an email when a new federal OSHA severe-injury report for Building Systems, INC. is published. One employer, no account, unsubscribe in one click.
Site address
301 SOUTH FRONT STREET
City
HAMBURG
State
PA
ZIP
19526
Mailing
1036 BOOT ROAD, DOWNINGTOWN, PA 19335
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
8
Ownership type
A

1 citation on file for this inspection.

1926.706 B

Serious Gravity 10 7 instances 8 exposed
Issued
Apr 26, 2018
Abate by
May 22, 2018
Penalty
Initial $9,054 · Current $6,338 Reduced
29 CFR 1926.706(b): Masonry walls over eight feet in height were not adequately braced to prevent overturning and to prevent collapse until permanent supporting elements of the structure were in place:    At this job site, bracing systems had not been installed in such a manner so as to prevent overturning and collapse until the permanent supporting elements of the structure were in place:      a)  North Wall, Shop Area:  On or about January 13, 2018, and times prior thereto, adequate bracing systems were not installed on a masonry wall approximately 25 feet High x 87 feet Long.  The wall was braced with 3/8 inch cables secured to brackets, rebar, pallets of concrete block, a bundle of roof joists and a Hydro-Mobile scaffold.  Under wind gusts speed of 39 miles per hour the wall overturned and fell within the perimeter of the building.      b)  North Wall, Detail Area:  On or about February 6, 2018, and times prior thereto, adequate bracing systems were not installed on a masonry wall approximately 21 feet High x 25 feet Long.  The wall was braced on the interior side with lumber (2x12x16's; and a 2x4), and no bracing installed on the exterior side of the wall.      c)  West Exterior Wall, Detail Area:  On or about February 6, 2018, and times prior thereto, adequate bracing systems were not installed on a masonry wall approximately 21 feet High x 84 feet Long.  The wall was braced with lumber (2x12x16's; and a 2x4), and 3/8 inch cables secured to rebar, brackets and pallets of concrete block.      d)  South Wall, Detail Area:  On or about February 6, 2018, and times prior thereto, bracing systems were not installed on a masonry wall approximately 21 feet High x 25 feet Long.        e)  South Wall, Shop Area: On or about February 6, 2018, and times prior thereto, adequate bracing systems were not installed on a masonry wall over 8 feet high and approximately 118 feet Long.  The interior side of the wall was braced with 3/8 inch cables secured to rebar, wrapped around concrete piers, angle iron, and a bundle of roof joists.  A smaller section of the wall was braced on both sides with lumber (2x12x16's; and a 2x4).       f)  Interior East Wall, Between Office Space and Shop Areas:  On or about February 6, 2018, and times prior thereto, bracing systems were not installed on a masonry wall approximately 13 feet High x 77 feet Long.      g)  Interior West Wall, Between Detail Area and Shop Areas:  On or about February 6, 2018, and times prior thereto, adequate bracing systems were not installed on a masonry wall approximately 25 feet High x 77 feet Long.  The wall was braced with ¼ inch cables secured to rebar, a bundle of roof joists, and brackets.      Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $6337.8
  • — Z (S) $9054

View Building Systems, INC.'s full OSHA safety record →