On , OSHA opened a complaint safety inspection of DURO FIBER CO., INC. in 11 PARK AVENUE, HUDSON, NH 03051 (NAICS 423390). OSHA activity number 342981800.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Duro Fiber CO., INC. — free Get an email when a new federal OSHA severe-injury report for Duro Fiber CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
11 PARK AVENUE
City
HUDSON
State
NH
ZIP
03051
Mailing
11 PARK AVENUE, HUDSON, NH 03051
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423390
Employees
10
Ownership type
A

11 citations on file for this inspection.

1910.37 B02

Other-than-serious 1 instance 5 exposed
Issued
May 1, 2018
Abate by
May 18, 2018
Penalty
Initial $1,663 · Current $0 Reduced
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit":    Location: finishing department  On or about 2/28/18, the employer did not ensure an exit door was marked with an "exit" sign.
Recent events (2)
  • — I (O) $0
  • — Z (S) $1663

1910.157 C04

Serious Gravity 5 1 instance 5 exposed
Issued
May 1, 2018
Abate by
May 18, 2018
Penalty
Initial $2,772 · Current $1,400 Reduced
29 CFR 1910.157(c)(4): Portable fire extinguishers were not maintained in a fully charged and operable condition:    Location: finish area next to the air compressor  On or abut 2/28/18, the employer did not ensure fire extinguishers were fully charged.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2772

1910.157 E02

Serious Gravity 5 1 instance 5 exposed
Issued
May 1, 2018
Abate by
May 18, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.157(e)(2): Portable fire extinguishers were not visually inspected at least monthly:  Location: throughout the facility On or about 2/28/18, the employer did not ensure fire extinguishers were visually inspected monthly
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.178 Q07

Serious Gravity 5 1 instance 5 exposed
Issued
May 1, 2018
Abate by
May 18, 2018
Penalty
Initial $2,772 · Current $1,400 Reduced
29 CFR 1910.178(q)(7): Industrial trucks were not examined before being placed in service:    Location: site  On or about 2/28/18 employees were exposed to struck-by, crushing, carbon monoxide hazards from a fork lift that was not inspected daily prior to use.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2772

1910.303 B02

Serious Gravity 5 2 instances 6 exposed
Issued
May 1, 2018
Abate by
Jun 18, 2018
Penalty
Initial $2,772 · Current $1,400 Reduced
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:    (a) Location: finishing department  On or about 2/28/18, a Underwriters Laboratory (UL) labeled extension cord was used in place of approved permanent wiring when the overhead light fixture was connected to power by hard wiring the extension cord to the light.    (b) Location: finishing department desk by entryway to lay-up area  On or about 2/28/18, a relocatable tap or "power strip" was used to supply power to a 3/8 inch drill. The power tap was also plugged into an extension cord and not directly to permanent power as required by UL listing.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2772

1910.303 F02

Other-than-serious 2 instances 10 exposed
Issued
May 1, 2018
Abate by
Jun 18, 2018
Penalty
Initial $2,772 · Current $0 Reduced
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident:    (a) Location: finishing department by office/bathroom  (b) Location: Lay-up area in passageway by office door  On or about 2/28/18, the employer did not ensure circuit breakers were labeled to indicate their purpose.
Recent events (2)
  • — I (O) $0
  • — Z (S) $2772

1910.304 F01 VIII

Other-than-serious 2 instances 10 exposed
Issued
May 1, 2018
Abate by
Jun 18, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.304(f)(1)(viii): Circuit breakers used as switches in 120-volt and 277-volt, fluorescent lighting circuits were not listed and marked "SWD."    (a) Location: finishing department by office/bathroom  (b) Location: Lay-up area in passageway by office door  On or about 2/28/18, 277 volt fluorescent lights were operated by circuit breakers which were not labeled "SW" to indicate the can be used as switches.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.305 B01 II

Serious Gravity 5 1 instance 4 exposed
Issued
May 1, 2018
Abate by
May 25, 2018
Penalty
Initial $2,772 · Current $1,400 Reduced
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed:    Location: outside the paint booth  On or about 2/28/18, the employer did not ensure an electrical box within 5 feet of the spray booth had unused  openings closed.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2772

1910.305 B02 I

Serious Gravity 5 2 instances 3 exposed
Issued
May 1, 2018
Abate by
May 25, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(b)(2)(i): Each outlet box in completed installations did not have a cover, faceplate, or fixture canopy:  Location: Finishing Department On or about 2/28/18, two 120 volt outlet boxes in use did not have faceplates.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 C04

Serious Gravity 5 1 instance 3 exposed
Issued
May 1, 2018
Abate by
May 25, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(c)(4): Snap switches mounted in boxes did not have faceplates installed so as to completely cover the opening and seat against the finished surface.   Location: Finishing Department On or about 2/28/18, a light switch used for 120 volt shop lighting did not have a faceplate.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G02 III

Serious Gravity 5 1 instance 2 exposed
Issued
May 1, 2018
Abate by
May 11, 2018
Penalty
Initial $2,772 · Current $1,400 Reduced
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws:    Location: finish area   On or about 2/28/18 an extension cord used in conjunction with a relocatable power tap (surge strip) did not have strain relief which exposed employees to an electrical shock hazard.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2772

View Duro Fiber CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342981800.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.