OSHA Inspection: SUMMIT UTILITY STRUCTURES, LLC

Follow-up inspection · Health discipline

On , OSHA opened a follow-up health inspection of SUMMIT UTILITY STRUCTURES, LLC in 2027 SOUTH 12TH STREET BUILDING 504, ALLENTOWN, PA 18103 (NAICS 332312). OSHA activity number 344289160.

Watch Summit Utility Structures, LLC — free Get an email when a new federal OSHA severe-injury report for Summit Utility Structures, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2027 SOUTH 12TH STREET BUILDING 504
City
ALLENTOWN
State
PA
ZIP
18103
Mailing
2027 SOUTH 12TH STREET BUILDING 504, ALLENTOWN, PA 18103
Inspection type
Follow-up (F)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332312
Employees
40
Ownership type
A

3 citations on file for this inspection.

1910.95 K01

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $5636.00 · Current $0.00 Reduced
29 CFR 1910.95(k)(1): The employer did not train each employee who is exposed to noise at or above an 8-hour time-weighted average of 85 decibels in accordance with the requirements of 29 CFR 1910.95(k):     a) Shop Area: An employee, Welder , was exposed to continuous noise at 84.4% of the permissible exposure level of 90 dBA or an eight-hour time-weighted average of 88.7 dBA. This exposure was observed over a 458 minute sampling period on September 10, 2019. The employee was not trained on the effects of noise or the purpose of the audiometric testing, on or about September 10, 2019.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (S) $5636

1910.254 D09 III

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $3381.00 · Current $6408.00
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replace:  a) Welding Area: Employees MIG welding used grounding cables that were damaged and not replaced, on or about September 10, 2019.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $6408
  • — Z (S) $3381

1910.134 C02 II

Other-than-serious 1 instance 4 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1910.134(c)(2)(ii): The employer did not establish and implement those elements of a written program necessary to ensure that any employee using a respirator voluntarily was medically able to use that respirator, and that the respirator was cleaned, stored, and maintained so that its use does not present a health hazard to the user:  a) Shop Area: Employees wore elastomeric half face respirators on a voluntary basis while welding and the employer did establish a written program including medical evaluations and storage requirements, on or about September 6, 2019.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.