Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ELIEZER J PEREZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ELIEZER J PEREZ in 358 BLISS RD, LONGMEADOW, MA 01106 (NAICS 238160). OSHA activity number 344549878.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Eliezer J Perez — free Get an email when a new federal OSHA severe-injury report for Eliezer J Perez is published. One employer, no account, unsubscribe in one click.
Establishment
ELIEZER J PEREZ
Site address
358 BLISS RD
City
LONGMEADOW
State
MA
ZIP
01106
Mailing
30 QUINCY ST, SPRINGFIELD, MA 01109
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
9
Ownership type
A

4 citations on file for this inspection.

1903.19 C01

Other-than-serious 2 instances 2 exposed
Issued
Jun 24, 2020
Abate by
Aug 4, 2020
Penalty
Initial $325 · Current $0 Reduced
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that each cited violation has been abated:  As of June 23, 2020 the Employer had not certified to OSHA that the abatement was completed for the violations from Inspection 1454987, issued on 2/26/2020 with a final order date of 3/18/2020
Recent events (3)
  • — F (O) $0
  • — C (O) $325
  • — Z (O) $325

1903.19 D01

Other-than-serious 2 instances 2 exposed
Issued
Jun 24, 2020
Abate by
Aug 4, 2020
Penalty
Initial $325 · Current $0 Reduced
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  As of June 23, 2020, the Employer had not submitted to the Agency the abatement documentation required for the violation issued on 2/26/2020 on which it was indicated that such abatement documentation was required to be submitted to the Agency.
Recent events (3)
  • — F (O) $0
  • — C (O) $325
  • — Z (O) $325

1926.501 B13

Willful Gravity 10 1 instance 2 exposed
Issued
Feb 6, 2020
Abate by
Mar 11, 2020
Penalty
Initial $26,987 · Current $0 Reduced
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels was not protected by guardrail systems, safety net system, or personal fall arrest system:  358 Bliss Rd., Longmeadow: On or about November 5, 2019, two employees were observed roofing this residence without any fall protection, more than 10 feet above the ground below.  The employer routinely does not assure effective protection against falls as required by the standard, as demonstrated on June 21, 2019, when employees were installing shingles on a residential roof located at 358 Bliss Rd., Longmeadow, MA without fall protection. Employees were exposed to fall hazards of more than 17 feet above the next lower level (ground).  Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (3)
  • — F (W) $0
  • — C (W) $26987
  • — Z (W) $26987

1926.503 B01

Serious Gravity 5 1 instance 8 exposed
Issued
Feb 6, 2020
Abate by
Mar 11, 2020
Penalty
Initial $2,892 · Current $0 Reduced
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written certification record:  358 Bliss Rd., Longmeadow, MA: On or about November 5, 2019 the employer had not verified compliance with this paragraph by preparing a written certification for employee fall protection training for persons he employs as roofers.   Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (3)
  • — F (S) $0
  • — C (S) $2892
  • — Z (S) $2892

View Eliezer J Perez's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344549878.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.