RED HILL, PA —
OSHA Inspection: MUTUAL INDUSTRIES INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of MUTUAL INDUSTRIES INC. in 625 WASHINGTON STREET, RED HILL, PA 18076 (NAICS 313220). OSHA activity number 344886585.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MUTUAL INDUSTRIES INC.
- Site address
- 625 WASHINGTON STREET
- City
- RED HILL
- State
- PA
- ZIP
- 18076
- Mailing
- 625 WASHINGTON STREET, RED HILL, PA 18076
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 313220
- Employees
- 26
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.22 B
- Issued
- Sep 11, 2020
- Abate by
- Nov 16, 2020
- Penalty
- Initial $3,441 · Current $1,441 Reduced
General-duty citation text
29 CFR 1910.22(b): The employer did not ensure that each walking-working surface could support the maximum intended load for that surface: a) Finishing Area: The floor an employee walked across to get to the machine's counter on a daily basis was subsiding and was not able to support the equipment, on or about August 17, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1441
- — Z (S) $3441
1926.1101 K01 II
- Issued
- Sep 11, 2020
- Abate by
- Nov 2, 2020
- Penalty
- Initial $4,588 · Current $2,579 Reduced
9020
General-duty citation text
29 CFR 1926.1101(k)(1)(ii): The employer did not include asbestos in the program established to comply with the Hazard Communication Standard (HCS), did not ensure that each employee had access to labels on containers of asbestos and safety data sheets, did not ensure that each employee was trained in accordance with the provisions of HCS and paragraphs (k)(9) and (10) of this section, and did not provide each employee information on at least the following hazards: Cancer and lung effects: a) Weave Room: Employees were exposing potentially asbestos containing material on steam pipes while repairing the wooden floor and the employer did not include asbestos in the Hazard Communication Program or train the employees on the cancer and lung effects of asbestos, on or about September 1, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2579
- — Z (S) $4588
1926.1101 K02 I
- Issued
- Sep 11, 2020
- Abate by
- Nov 2, 2020
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1926.1101(k)(2)(i): Before work subject to this standard began, the building and/or facility owner(s) did not determine the presence, location and quantity of asbestos containing material (ACM) and/or presumed asbestos containing material (PACM) at the worksite pursuant to 29 CFR 1926.1101(k)(1): a) Weave Room: Employees were exposing presumed asbestos containing material on steam pipes while repairing the wooden floor and the employer did not determine the location and quantity of ACM or PACM, on or about September 1, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.1200 E01
- Issued
- Sep 11, 2020
- Abate by
- Nov 2, 2020
- Penalty
- Initial $0 · Current $0
9020
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) Weave Room: Employees were operating looms that caused fiberglass filaments to be released in the air and the employer did not develop a Hazard Communication Program, on or about August 17, 2020. b) Weave Room: Employees were exposing potentially asbestos containing material on steam pipes while repairing the wooden floor and the employer did not develop a Hazard Communication Program, on or about September 1, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Mutual Industries INC.
View Mutual Industries INC.'s full OSHA safety record →
More inspections in this industry (NAICS 313220)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344886585.